Scope of Work
GR Engineering completed the DFS for the restart of the 1.2Mpta Davyhurst gold processing plant in June 2020 and was awarded the EPC contract to commence site refurbishment and debottlenecking works in July.
Part of the scope is to refurbish the steel work, plate work and concrete onsite using a specialist concrete and surface treatment remediation contractor. The major scope included remediation of concrete plinths for the primary crusher and mills as well as application of surface treatment inside various leach and adsorption tanks. All mechanical equipment onsite is to be inspected and refurbished as required to ensure it is fit for purpose.
Various debottlenecking activities are also being undertaken to provide better plant availability and operability. The major debottlenecking activities include installation of a new and larger double deck screen in the crushing circuit, upgrade and automation of the two remote bore fields that provide water to the plant and the supply and installation of additional instrumentation, process control and automation throughout the processing plant.
The process plant facility is scheduled to commence ore commissioning in January 2021.
Gallery
Project Fact Sheet
Click to download
Associated News
GR Engineering is pleased to announce that is has been awarded an engineering, procurement and construction contract with Ora Banda Mining Limited associated with the restart of the existing Davyhurst Gold Processing Plant located in Western Australia.
Related Projects
View Projects Map