﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><atom:link href="https://www.gres.com.au/rss/default.aspx?plcId=f1acc4d3-4565-4580-ab3d-5338b7de4030&amp;title=GR%20Engineering%20Services&amp;description=RSS%20News%20Feed" rel="self" type="application/rss+xml" /><link>http://www.gres.com.au:8081/rss/default.aspx?plcId=f1acc4d3-4565-4580-ab3d-5338b7de4030&amp;title=GR%20Engineering%20Services&amp;description=RSS%20News%20Feed</link><title>GR Engineering Services</title><description>RSS News Feed</description><pubDate>Sat, 14 Mar 2026 23:18:53 GMT</pubDate><lastBuildDate>Sat, 14 Mar 2026 23:18:53 GMT</lastBuildDate><generator>Mintox</generator><item><title>Appointed as Preferred Contractor – Tower Hill Gold Project</title><link>http://www.gres.com.au/news/article/23022026-120/appointed-as-preferred-contractor-tower-hill-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/23022026-120/appointed-as-preferred-contractor-tower-hill-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Appointed as Preferred Contractor – Tower Hill Gold Project" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been appointed preferred contractor by Genesis Minerals Limited (ASX: GMD) (Genesis) in relation to the engineering, procurement and construction (EPC) contract for the Tower Hill Gold Project (the Project).&nbsp;]]></description><pubDate>Sun, 22 Feb 2026 16:00:00 GMT</pubDate></item><item><title>HY26 Financial Results</title><link>http://www.gres.com.au/news/article/20022026-120/hy26-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/20022026-120/hy26-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY26 Financial Results" />GR Engineering Services Limited (ASX:GNG) (the &lsquo;Group&rsquo;) today announces its financial results for the half year ended 31 December 2025 (HY26).]]></description><pubDate>Thu, 19 Feb 2026 16:00:00 GMT</pubDate></item><item><title>Appointed as Preferred Contractor – Laverton Processing Plant </title><link>http://www.gres.com.au/news/article/17022026-120/appointed-as-preferred-contractor-laverton-processing-plant.aspx</link><guid>http://www.gres.com.au/news/article/17022026-120/appointed-as-preferred-contractor-laverton-processing-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Appointed as Preferred Contractor – Laverton Processing Plant " />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been appointed preferred contractor by Brightstar Resources Limited (ASX: BTR) (Brightstar) in relation to the engineering, procurement and construction (EPC) contract for the Laverton Processing Plant (the Project).&nbsp;]]></description><pubDate>Mon, 16 Feb 2026 16:00:00 GMT</pubDate></item><item><title>2025 Annual Report</title><link>http://www.gres.com.au/news/article/22102025-120/2025-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/22102025-120/2025-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/2025_Annual_Report.png" alt="2025 Annual Report" />GR Engineering&#39;s Annual Report for the financial year ended June 2025&nbsp;is now available.]]></description><pubDate>Tue, 21 Oct 2025 16:00:00 GMT</pubDate></item><item><title>FY25 Financial Results</title><link>http://www.gres.com.au/news/article/25082025-120/fy25-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/25082025-120/fy25-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY25 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or the Group) today announces its financial results for the financial year ended 30 June 2025 (FY25).&nbsp;]]></description><pubDate>Sun, 24 Aug 2025 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Eloise Copper Expansion Project </title><link>http://www.gres.com.au/news/article/20062025-120/epc-contract-eloise-copper-expansion-project.aspx</link><guid>http://www.gres.com.au/news/article/20062025-120/epc-contract-eloise-copper-expansion-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Eloise Copper Expansion Project " />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction (EPC) contract by AIC Copper Pty Ltd, a wholly owned subsidiary of AIC Mines Limited (ASX:A1M) (AIC Mines), for the expansion of the existing Eloise copper processing facility in northern Queensland (the Project).&nbsp;]]></description><pubDate>Thu, 19 Jun 2025 16:00:00 GMT</pubDate></item><item><title>King of the Hills Operations Stage 2 Upgrade </title><link>http://www.gres.com.au/news/article/05062025-179/king-of-the-hills-operations-stage-2-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/05062025-179/king-of-the-hills-operations-stage-2-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="King of the Hills Operations Stage 2 Upgrade " />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded a variation to its existing engineering, procurement and construction (EPC) contract with Greenstone Resources (WA) Pty Ltd, a wholly owned subsidiary of Vault Minerals Limited (ASX:VAU) (Vault), for the Stage 2 Upgrade for the King of the Hills Operations (Stage 2 Upgrade).&nbsp;]]></description><pubDate>Wed, 04 Jun 2025 16:00:00 GMT</pubDate></item><item><title>HY25 Financial Results</title><link>http://www.gres.com.au/news/article/24022025-120/hy25-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/24022025-120/hy25-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY25 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or the Group) today announces its financial results for the half year ended 31 December 2024 (HY25).&nbsp;]]></description><pubDate>Sun, 23 Feb 2025 16:00:00 GMT</pubDate></item><item><title>EPC Contract – King of the Hills Operations Stage 1 Upgrade</title><link>http://www.gres.com.au/news/article/28012025-179/epc-contract-king-of-the-hills-operations-stage-1-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/28012025-179/epc-contract-king-of-the-hills-operations-stage-1-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – King of the Hills Operations Stage 1 Upgrade" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction (EPC) contract with Greenstone Resources (WA) Pty Ltd, a wholly owned subsidiary of Vault Minerals Limited (ASX:VAU) (Vault), for the Stage 1 Upgrade for the King of the Hill Operations (the Project).&nbsp;]]></description><pubDate>Mon, 27 Jan 2025 16:00:00 GMT</pubDate></item><item><title>Contract Extension Award – GR Production Services – Wellsite Maintenance Execution Services</title><link>http://www.gres.com.au/news/article/31102024-172/contract-extension-award-gr-production-services-wellsite-maintenance-execution-services.aspx</link><guid>http://www.gres.com.au/news/article/31102024-172/contract-extension-award-gr-production-services-wellsite-maintenance-execution-services.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/logo/Square_Logo_GRPS.png" alt="Contract Extension Award – GR Production Services – Wellsite Maintenance Execution Services" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that its wholly owned subsidiary, GR Production Services (GRPS) has been awarded a contract extension for two years with Santos Limited (ASX:STO) (Santos). GRPS will continue to provide wellsite maintenance execution services for Santos in both the Surat and Cooper Basins. The estimated revenue from the Well Site Maintenance work scope is $9 million per annum, with additional projects totalling $6 million per annum, for each of the two years.]]></description><pubDate>Wed, 30 Oct 2024 16:00:00 GMT</pubDate></item><item><title>2024 Annual Report</title><link>http://www.gres.com.au/news/article/31102024-122/2024-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/31102024-122/2024-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/2024_Annual_Report.png" alt="2024 Annual Report" />GR Engineering&#39;s Annual Report for the financial year ended June 2024&nbsp;is now available.]]></description><pubDate>Wed, 30 Oct 2024 16:00:00 GMT</pubDate></item><item><title>Design and Construct Contract – Woodlawn Restart Project </title><link>http://www.gres.com.au/news/article/20092024-120/design-and-construct-contract-woodlawn-restart-project.aspx</link><guid>http://www.gres.com.au/news/article/20092024-120/design-and-construct-contract-woodlawn-restart-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Design and Construct Contract – Woodlawn Restart Project " />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded a Design and Construct contract with Develop Global Limited (ASX:DVP) (Develop) for the Woodlawn Restart Project (the Project).&nbsp;]]></description><pubDate>Thu, 19 Sep 2024 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Kathleen Valley Lithium Backfill Project</title><link>http://www.gres.com.au/news/article/10052024-178/epc-contract-kathleen-valley-lithium-backfill-project.aspx</link><guid>http://www.gres.com.au/news/article/10052024-178/epc-contract-kathleen-valley-lithium-backfill-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.auhttps://cdn.mintox.com/public/grescomau/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Kathleen Valley Lithium Backfill Project" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction (EPC) contract with LRL (Aust) Pty Ltd, a wholly owned subsidiary of Liontown Resources Limited (ASX:LTR) (Liontown), for the Kathleen Valley Lithium Backfill Project (the Project).]]></description><pubDate>Thu, 09 May 2024 16:00:00 GMT</pubDate></item><item><title>Appointment of Non-Executive Director – Debbie Morrow</title><link>http://www.gres.com.au/news/article/18042024-120/appointment-of-non-executive-director-debbie-morrow.aspx</link><guid>http://www.gres.com.au/news/article/18042024-120/appointment-of-non-executive-director-debbie-morrow.aspx</guid><description><![CDATA[<img src="http://www.gres.com.auhttps://cdn.mintox.com/public/grescomau/Image/News/thumbs/Appointment-Study-Manager-or-Board-Member-2019.jpg" alt="Appointment of Non-Executive Director – Debbie Morrow" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to advise that it has appointed Ms Debbie Morrow to its Board as a Non-Executive Director, effective 18 April 2024.]]></description><pubDate>Wed, 17 Apr 2024 16:00:00 GMT</pubDate></item><item><title>HY24 Financial Results</title><link>http://www.gres.com.au/news/article/22022024-120/hy24-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/22022024-120/hy24-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY24 Financial Results" /><p>GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the half year ended 31 December 2023 (HY24).</p>
]]></description><pubDate>Wed, 21 Feb 2024 16:00:00 GMT</pubDate></item><item><title>ASX Announcement - Mipac Acquires WA Based Process Controls Business</title><link>http://www.gres.com.au/news/article/01022024-171/asx-announcement-mipac-acquires-wa-based-process-controls-business.aspx</link><guid>http://www.gres.com.au/news/article/01022024-171/asx-announcement-mipac-acquires-wa-based-process-controls-business.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/logo/Mipac.png" alt="ASX Announcement - Mipac Acquires WA Based Process Controls Business" /><p>GR Engineering Services Limited (ASX:GNG) (<strong>GR Engineering</strong> or the <strong>Company</strong>) is pleased to announce that its wholly owned subsidiary, Mipac Holdings Pty Ltd (<strong>Mipac</strong>) has entered into an agreement to acquire Paradigm Engineers Pty Ltd <strong>(Paradigm)</strong>, a provider of control systems and electrical engineering, automation and technology services based in Western Australia.</p>
]]></description><pubDate>Wed, 31 Jan 2024 16:00:00 GMT</pubDate></item><item><title>2023 Annual Report</title><link>http://www.gres.com.au/news/article/10012024-122/2023-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/10012024-122/2023-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/GRES_Annual_Report_2023.png" alt="2023 Annual Report" />GR Engineering&#39;s Annual Report for the financial year ended June 2023&nbsp;is now available.]]></description><pubDate>Tue, 09 Jan 2024 16:00:00 GMT</pubDate></item><item><title>EPC Award – Kainantu Gold Mine – 1.2 Mtpa Process Plant </title><link>http://www.gres.com.au/news/article/04122023-120/epc-award-kainantu-gold-mine-1-2-mtpa-process-plant.aspx</link><guid>http://www.gres.com.au/news/article/04122023-120/epc-award-kainantu-gold-mine-1-2-mtpa-process-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Award – Kainantu Gold Mine – 1.2 Mtpa Process Plant " />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has executed engineering, procurement and construction (EPC) contracts with K92 Mining Ltd, a subsidiary of Toronto Stock Exchange (TSX) listed K92 Mining Inc. (TSX: KNT) for a 1.2 Mtpa Process Plant at the Kainantu Gold Mine in Papua New Guinea (PNG).]]></description><pubDate>Sun, 03 Dec 2023 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Mungari Future Growth Project - Process Plant</title><link>http://www.gres.com.au/news/article/29092023-120/epc-contract-mungari-future-growth-project-process-plant.aspx</link><guid>http://www.gres.com.au/news/article/29092023-120/epc-contract-mungari-future-growth-project-process-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Mungari Future Growth Project - Process Plant" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been awarded a $155 million engineering,&nbsp;procurement and construction (EPC) contract with Evolution Mining Limited (ASX: EVN) (Evolution Mining) for the Mungari Growth Project - Process Plant (the Project) 20km west of Kalgoorlie in Western Australia.]]></description><pubDate>Thu, 28 Sep 2023 16:00:00 GMT</pubDate></item><item><title>GR Production Services (formerly Upstream PS) rebrand</title><link>http://www.gres.com.au/news/article/25082023-172/gr-production-services-formerly-upstream-ps-rebrand.aspx</link><guid>http://www.gres.com.au/news/article/25082023-172/gr-production-services-formerly-upstream-ps-rebrand.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/logo/GRPS_logo-CMYK.png" alt="GR Production Services (formerly Upstream PS) rebrand" /><p>From our companies: <em><strong>GR Production Services (GRPS)</strong></em>, formerly Upstream Production Services</p>
]]></description><pubDate>Thu, 24 Aug 2023 16:00:00 GMT</pubDate></item><item><title>FY23 Financial Results</title><link>http://www.gres.com.au/news/article/23082023-120/fy23-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/23082023-120/fy23-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY23 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the financial year ended 30 June 2023 (FY23).&nbsp;]]></description><pubDate>Tue, 22 Aug 2023 16:00:00 GMT</pubDate></item><item><title>Contract Award – Queensland Pacific Metals - Operations and Maintenance Services</title><link>http://www.gres.com.au/news/article/08082023-172/contract-award-queensland-pacific-metals-operations-and-maintenance-services.aspx</link><guid>http://www.gres.com.au/news/article/08082023-172/contract-award-queensland-pacific-metals-operations-and-maintenance-services.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/logo/GRPS_logo-CMYK.png" alt="Contract Award – Queensland Pacific Metals - Operations and Maintenance Services" />From our companies: <em><strong>GR Production Services (GRPS)</strong></em>, formerly Upstream Production Services]]></description><pubDate>Mon, 07 Aug 2023 16:00:00 GMT</pubDate></item><item><title>Santos Cooper Basin – Contract Award - Maintenance and Operations Services</title><link>http://www.gres.com.au/news/article/08082023-172/santos-cooper-basin-contract-award-maintenance-and-operations-services.aspx</link><guid>http://www.gres.com.au/news/article/08082023-172/santos-cooper-basin-contract-award-maintenance-and-operations-services.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/logo/GRPS_logo-CMYK.png" alt="Santos Cooper Basin – Contract Award - Maintenance and Operations Services" />From our companies: <em><strong>GR Production Services (GRPS)</strong></em>, formerly Upstream Production Services]]></description><pubDate>Mon, 07 Aug 2023 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Yangibana Rare Earths Project - Beneficiation Plan</title><link>http://www.gres.com.au/news/article/04082023-120/epc-contract-yangibana-rare-earths-project-beneficiation-plan.aspx</link><guid>http://www.gres.com.au/news/article/04082023-120/epc-contract-yangibana-rare-earths-project-beneficiation-plan.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Yangibana Rare Earths Project - Beneficiation Plan" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction (EPC) contract with Yangibana Pty Ltd, a wholly owned subsidiary of Hastings Technology Metals Limited (ASX: HAS) (Hastings), for a beneficiation plant and associated infrastructure for the Yangibana Rare Earths Project (the Project) in Western Australia.]]></description><pubDate>Thu, 03 Aug 2023 16:00:00 GMT</pubDate></item><item><title>Letter of Intent – Kainantu Gold Mine – 1.2 Mtpa Process Plant - EPC</title><link>http://www.gres.com.au/news/article/25072023-120/letter-of-intent-kainantu-gold-mine-1-2-mtpa-process-plant-epc.aspx</link><guid>http://www.gres.com.au/news/article/25072023-120/letter-of-intent-kainantu-gold-mine-1-2-mtpa-process-plant-epc.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Letter of Intent – Kainantu Gold Mine – 1.2 Mtpa Process Plant - EPC" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has received a Letter of Intent from K92 Mining Ltd, a subsidiary of Toronto Stock Exchange (TSX) listed K92 Mining Inc. (TSX: KNT) (K92 Mining), for the engineering, procurement and construction (EPC) works for a 1.2 Mtpa Process Plant at the Kainantu Gold Mine in Papua New Guinea (PNG).]]></description><pubDate>Mon, 24 Jul 2023 16:00:00 GMT</pubDate></item><item><title>Binding Term Sheet – Yangibana Rare Earths Project - Beneficiation Plant EPC</title><link>http://www.gres.com.au/news/article/03052023-120/binding-term-sheet-yangibana-rare-earths-project-beneficiation-plant-epc.aspx</link><guid>http://www.gres.com.au/news/article/03052023-120/binding-term-sheet-yangibana-rare-earths-project-beneficiation-plant-epc.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Binding Term Sheet – Yangibana Rare Earths Project - Beneficiation Plant EPC" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has entered into a binding term sheet with Yangibana Pty Ltd, a wholly owned subsidiary of Hastings Technology Metals Limited (ASX: HAS) (Hastings), for the engineering, procurement and construction (EPC) of the beneficiation plant and associated infrastructure for the Yangibana Rare Earths Project (the Project) in Western Australia.]]></description><pubDate>Tue, 02 May 2023 16:00:00 GMT</pubDate></item><item><title>West Musgrave Project – Design and Construction works</title><link>http://www.gres.com.au/news/article/14042023-177/west-musgrave-project-design-and-construction-works.aspx</link><guid>http://www.gres.com.au/news/article/14042023-177/west-musgrave-project-design-and-construction-works.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="West Musgrave Project – Design and Construction works" /><p style="margin-left:6.9pt;">GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has entered into two contracts with OZ Minerals Musgrave Operations Pty Ltd, a wholly owned subsidiary of OZ Minerals Limited (ASX: OZL), for the design and construction works of the West Musgrave Mineral Processing Plant (West Musgrave Project) in Western Australia.</p>
]]></description><pubDate>Thu, 13 Apr 2023 16:00:00 GMT</pubDate></item><item><title>HY23 Financial Results</title><link>http://www.gres.com.au/news/article/21022023-120/hy23-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/21022023-120/hy23-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY23 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the half year ended 31 December 2022 (HY23).]]></description><pubDate>Mon, 20 Feb 2023 16:00:00 GMT</pubDate></item><item><title>Appointment of Managing Director</title><link>http://www.gres.com.au/news/article/16022023-120/appointment-of-managing-director.aspx</link><guid>http://www.gres.com.au/news/article/16022023-120/appointment-of-managing-director.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Appointment-Study-Manager-or-Board-Member-2019.jpg" alt="Appointment of Managing Director" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that Tony Patrizi will be appointed as Managing Director, effective immediately. Tony Patrizi has been GR Engineering&rsquo;s acting Managing Director since October 2022.]]></description><pubDate>Wed, 15 Feb 2023 16:00:00 GMT</pubDate></item><item><title>Appointment as Preferred Tenderer – Sorby Hills Lead-Silver Project</title><link>http://www.gres.com.au/news/article/21112022-120/appointment-as-preferred-tenderer-sorby-hills-lead-silver-project.aspx</link><guid>http://www.gres.com.au/news/article/21112022-120/appointment-as-preferred-tenderer-sorby-hills-lead-silver-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Appointment as Preferred Tenderer – Sorby Hills Lead-Silver Project" /><p>GR Engineering Services Limited&nbsp;is pleased to announce that it has been appointed preferred tenderer by Boab Metals Limited&nbsp;in relation to the engineering, procurement and construction (EPC) contract for the processing plant and non-process infrastructure for the Sorby Hills Lead-Silver Project located in Kununurra, Western Australia.</p>
]]></description><pubDate>Sun, 20 Nov 2022 16:00:00 GMT</pubDate></item><item><title>Increasing Scope of Work - Cosmos Nickel Concentrator Facility Upgrade</title><link>http://www.gres.com.au/news/article/31102022-120/increasing-scope-of-work-cosmos-nickel-concentrator-facility-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/31102022-120/increasing-scope-of-work-cosmos-nickel-concentrator-facility-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Increasing Scope of Work - Cosmos Nickel Concentrator Facility Upgrade" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that the scope of work has increased in relation to the engineering, procurement and construction (EPC) contract with Australian Nickel Investments Pty Ltd, a wholly owned subsidiary of IGO Limited (ASX:IGO) (IGO), for the upgrade of the existing nickel concentrator at the Cosmos Nickel Operations (the Project).&nbsp;]]></description><pubDate>Sun, 30 Oct 2022 16:00:00 GMT</pubDate></item><item><title>Managing Director Transition</title><link>http://www.gres.com.au/news/article/26102022-120/managing-director-transition.aspx</link><guid>http://www.gres.com.au/news/article/26102022-120/managing-director-transition.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Board_Changes_Icon_001-100.jpg" alt="Managing Director Transition" /><p>GR Engineering Services Limited (ASX:GNG) (GR Engineering or the Company) today announces that the Company&rsquo;s Managing Director, Geoff Jones, has decided to resign from his position at the end of January 2023, after serving more than nine years in the role.&nbsp;</p>
]]></description><pubDate>Tue, 25 Oct 2022 16:00:00 GMT</pubDate></item><item><title>2022 Annual Report</title><link>http://www.gres.com.au/news/article/21102022-122/2022-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/21102022-122/2022-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/2022/2022AR.png" alt="2022 Annual Report" />GR Engineering&#39;s Annual Report for the financial year ended June 2022&nbsp;is now available.]]></description><pubDate>Thu, 20 Oct 2022 16:00:00 GMT</pubDate></item><item><title>Thunderbird Mineral Sands Project – Full Notice to Proceed</title><link>http://www.gres.com.au/news/article/07102022-153/thunderbird-mineral-sands-project-full-notice-to-proceed.aspx</link><guid>http://www.gres.com.au/news/article/07102022-153/thunderbird-mineral-sands-project-full-notice-to-proceed.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Thunderbird Mineral Sands Project – Full Notice to Proceed" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) refers to its announcement of 24 March 2022 in relation to the engineering, procurement and construction (EPC) contract (Contract) with Thunderbird Operations Pty Ltd (TOPL) for the mineral processing plant and associated facilities for the Thunderbird Mineral Sands Project (the Project), located in Western Australia.&nbsp;]]></description><pubDate>Thu, 06 Oct 2022 16:00:00 GMT</pubDate></item><item><title>Achievement of Final Investment Decision for West Musgrave Project</title><link>http://www.gres.com.au/news/article/23092022-177/achievement-of-final-investment-decision-for-west-musgrave-project.aspx</link><guid>http://www.gres.com.au/news/article/23092022-177/achievement-of-final-investment-decision-for-west-musgrave-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Achievement of Final Investment Decision for West Musgrave Project" /><p style="margin-left:6.9pt;">GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announced that OZ Minerals Limited (ASX: OZL) (OZ Minerals) has achieved Final Investment Decision (FID) for the West Musgrave Project (the Project) located in Western Australia.</p>
]]></description><pubDate>Thu, 22 Sep 2022 16:00:00 GMT</pubDate></item><item><title>FY22 Financial Results</title><link>http://www.gres.com.au/news/article/22082022-120/fy22-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/22082022-120/fy22-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY22 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the financial year ended 30 June 2022 (FY22).]]></description><pubDate>Sun, 21 Aug 2022 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Bellevue Gold Project</title><link>http://www.gres.com.au/news/article/20072022-174/epc-contract-bellevue-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/20072022-174/epc-contract-bellevue-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Bellevue Gold Project" /><p>GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has entered into a contract with Golden Spur Resources Pty Ltd, a wholly owned subsidiary of Bellevue Gold Limited (ASX: BGL) for the engineering, procurement and construction (EPC) works in relation to the 1.0 Mtpa gold processing plant and associated infrastructure for the Bellevue Gold Project (the Project) in Western Australia. The contract sum is $87.8 million.</p>
]]></description><pubDate>Tue, 19 Jul 2022 16:00:00 GMT</pubDate></item><item><title>FY22 Guidance Update - June 2022</title><link>http://www.gres.com.au/news/article/22062022-120/fy22-guidance-update-june-2022.aspx</link><guid>http://www.gres.com.au/news/article/22062022-120/fy22-guidance-update-june-2022.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY22 Guidance Update - June 2022" />The Directors of GR Engineering Services Limited (ASX: GNG) (<b>GR Engineering</b>) are pleased to advise that full year revenue guidance for the year ending 30 June 2022 (FY22) is forecast to be in the range of $620 million to $640 million.]]></description><pubDate>Tue, 21 Jun 2022 16:00:00 GMT</pubDate></item><item><title>2021 Annual Report</title><link>http://www.gres.com.au/news/article/27042022-122/2021-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/27042022-122/2021-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/GRES_2021_Annual_Report.png" alt="2021 Annual Report" />GR Engineering&#39;s Annual Report for the financial year ended 30 June 2021 is now available.]]></description><pubDate>Tue, 26 Apr 2022 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Thunderbird Mineral Sands Project</title><link>http://www.gres.com.au/news/article/24032022-153/epc-contract-thunderbird-mineral-sands-project.aspx</link><guid>http://www.gres.com.au/news/article/24032022-153/epc-contract-thunderbird-mineral-sands-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Thunderbird Mineral Sands Project" /><p>GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction contract (Contract) with Thunderbird Operations Pty Ltd (TOPL) for a mineral processing plant and associated facilities for the Thunderbird Mineral Sands Project (Project), located between Broome and Derby in Western Australia.</p>
]]></description><pubDate>Wed, 23 Mar 2022 16:00:00 GMT</pubDate></item><item><title>HY22 Financial Results</title><link>http://www.gres.com.au/news/article/22022022-120/hy22-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/22022022-120/hy22-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY22 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the half year ended 31 December 2021 (HY22).]]></description><pubDate>Mon, 21 Feb 2022 16:00:00 GMT</pubDate></item><item><title>Contract Award – Upstream Production Solutions – Blacktip Gas Field and Yelcherr Gas Plant</title><link>http://www.gres.com.au/news/article/04012022-172/contract-award-upstream-production-solutions-blacktip-gas-field-and-yelcherr-gas-plant.aspx</link><guid>http://www.gres.com.au/news/article/04012022-172/contract-award-upstream-production-solutions-blacktip-gas-field-and-yelcherr-gas-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Contract Award – Upstream Production Solutions – Blacktip Gas Field and Yelcherr Gas Plant" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions Pty Ltd (Upstream PS), has been awarded a new three year contract with an option for a further two years to provide maintenance and operations support services with Eni Australia, the operator of the Blacktip Gas Field and associated production infrastructure (Contract). Upstream PS has been providing maintenance services to Eni Australia for the last five years.]]></description><pubDate>Mon, 03 Jan 2022 16:00:00 GMT</pubDate></item><item><title>Contract Award – Mipac – Stage 2 of the Kyshtym Copper Electrolytic Plant</title><link>http://www.gres.com.au/news/article/08112021-171/contract-award-mipac-stage-2-of-the-kyshtym-copper-electrolytic-plant.aspx</link><guid>http://www.gres.com.au/news/article/08112021-171/contract-award-mipac-stage-2-of-the-kyshtym-copper-electrolytic-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/mipac-Announcement_Icon_2.png" alt="Contract Award – Mipac – Stage 2 of the Kyshtym Copper Electrolytic Plant" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that its wholly owned subsidiary, Mipac Pty Ltd (Mipac) has received engineering and procurement orders from MESCO Inc (MESCO) to complete Stage 2 work on the Kyshtym Copper Electrolytic Plant (the Project). As part of the work, Mipac will supply in-house developed specialised monitoring technology and software solutions.]]></description><pubDate>Sun, 07 Nov 2021 16:00:00 GMT</pubDate></item><item><title>Contract Award – Upstream Production Solutions – Santos Wellsite Maintenance and Brownfield Field Execution Services</title><link>http://www.gres.com.au/news/article/04112021-172/contract-award-upstream-production-solutions-santos-wellsite-maintenance-and-brownfield-field-execution-services.aspx</link><guid>http://www.gres.com.au/news/article/04112021-172/contract-award-upstream-production-solutions-santos-wellsite-maintenance-and-brownfield-field-execution-services.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Contract Award – Upstream Production Solutions – Santos Wellsite Maintenance and Brownfield Field Execution Services" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions Pty Ltd (Upstream PS) has been awarded a contract with Santos Limited (ASX: STO) (Santos) to provide wellsite maintenance and brownfield field execution services for their coal seam gas field infrastructure in the Surat Basin in Queensland.]]></description><pubDate>Wed, 03 Nov 2021 16:00:00 GMT</pubDate></item><item><title>Bluestone Mines Awards New Work to GR Engineering</title><link>http://www.gres.com.au/news/article/03112021-120/bluestone-mines-awards-new-work-to-gr-engineering.aspx</link><guid>http://www.gres.com.au/news/article/03112021-120/bluestone-mines-awards-new-work-to-gr-engineering.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Bluestone Mines Awards New Work to GR Engineering" /><p>GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been awarded additional work by Bluestone Mines Tasmania Pty Ltd (Bluestone Mines) that has a combined value of $31.7 million. This work will be performed by GR Engineering&rsquo;s team in Queensland and Tasmania.</p>
]]></description><pubDate>Tue, 02 Nov 2021 16:00:00 GMT</pubDate></item><item><title>FY22 Guidance Update</title><link>http://www.gres.com.au/news/article/01112021-120/fy22-guidance-update.aspx</link><guid>http://www.gres.com.au/news/article/01112021-120/fy22-guidance-update.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY22 Guidance Update" /><p>The Directors of GR Engineering Services Limited (ASX: GNG) (GR Engineering) are pleased to advise that full year revenue guidance for the year ending 30 June 2022 (FY22) is forecast to be in the range of $540 million to $560 million.</p>
]]></description><pubDate>Sun, 31 Oct 2021 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Cosmos Nickel Concentrator Facility Upgrade</title><link>http://www.gres.com.au/news/article/27102021-120/epc-contract-cosmos-nickel-concentrator-facility-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/27102021-120/epc-contract-cosmos-nickel-concentrator-facility-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Cosmos Nickel Concentrator Facility Upgrade" />GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction (EPC) contract from Australian Nickel Investments Pty Ltd,&nbsp;a wholly owned subsidiary of Western Areas Limited (ASX: WSA) (Western Areas), for the upgrade of the existing nickel concentrator at the Cosmos Nickel Operations (the Project).]]></description><pubDate>Tue, 26 Oct 2021 16:00:00 GMT</pubDate></item><item><title>Abra Base Metals Project – Notice to Proceed</title><link>http://www.gres.com.au/news/article/09092021-120/abra-base-metals-project-notice-to-proceed.aspx</link><guid>http://www.gres.com.au/news/article/09092021-120/abra-base-metals-project-notice-to-proceed.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Abra Base Metals Project – Notice to Proceed" />GR Engineering is now pleased to announce that Abra Mining has finalised its funding and issued GR Engineering with a full Notice to Proceed. The value of the Contract is $79.5 million, which will be realised predominantly in FY22.]]></description><pubDate>Wed, 08 Sep 2021 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Mt Ida Gold Project</title><link>http://www.gres.com.au/news/article/03092021-120/epc-contract-mt-ida-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/03092021-120/epc-contract-mt-ida-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Mt Ida Gold Project" /><p>GR Engineering Services Limited (ASX: GNG) (GR Engineering) is pleased to announce that it has executed an engineering, procurement and construction (EPC) contract with Aurenne Alt Resources Pty Limited (Aurenne) in relation to the Mt Ida Gold Project (the Project).</p>
]]></description><pubDate>Thu, 02 Sep 2021 16:00:00 GMT</pubDate></item><item><title>Subcontractor Agreement – Newmont Tanami Gold Mine</title><link>http://www.gres.com.au/news/article/02072021-120/subcontractor-agreement-newmont-tanami-gold-mine.aspx</link><guid>http://www.gres.com.au/news/article/02072021-120/subcontractor-agreement-newmont-tanami-gold-mine.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Subcontractor Agreement – Newmont Tanami Gold Mine" />GR Engineering&nbsp;is pleased to announce that it has executed a subcontractor agreement with RUC Cementation Mining Contractors Pty Ltd (RUC) in relation to Newmont Corporation&rsquo;s Tanami gold mine in Australia.]]></description><pubDate>Thu, 01 Jul 2021 16:00:00 GMT</pubDate></item><item><title>GR Engineering Acquires Leading Process Controls Business</title><link>http://www.gres.com.au/news/article/27042021-171/gr-engineering-acquires-leading-process-controls-business.aspx</link><guid>http://www.gres.com.au/news/article/27042021-171/gr-engineering-acquires-leading-process-controls-business.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GR Engineering Acquires Leading Process Controls Business" />GR Engineering is pleased to announce that it has entered into an agreement to acquire Minpac Holdings Pty Ltd, a leading global provider of control systems engineering, automation and technology services.&nbsp;]]></description><pubDate>Mon, 26 Apr 2021 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Norseman Gold Project</title><link>http://www.gres.com.au/news/article/13042021-120/epc-contract-norseman-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/13042021-120/epc-contract-norseman-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Norseman Gold Project" />GR Engineering is pleased to announced that it has entered into a contract with Pantoro Limited&nbsp;for the engineering, procurement and construction of a new processing plant for its 50% owned Norseman Gold Project.]]></description><pubDate>Mon, 12 Apr 2021 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Warrawoona Gold Project</title><link>http://www.gres.com.au/news/article/29032021-175/epc-contract-warrawoona-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/29032021-175/epc-contract-warrawoona-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Warrawoona Gold Project" />GR Engineering &nbsp;is pleased to announce that it has entered into a contract with Keras&nbsp;Gold Pty Ltd, a wholly owned subsidiary of Calidus Resources Limited, in relation to the design and construction of the process plant and associated infrastructure for the Warrawoona Gold Project.]]></description><pubDate>Sun, 28 Mar 2021 16:00:00 GMT</pubDate></item><item><title>HY21 Financial Results</title><link>http://www.gres.com.au/news/article/22022021-120/hy21-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/22022021-120/hy21-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY21 Financial Results" /><div>
<p>GR Engineering Services Limited&nbsp;today announced its financial results for the half year ended 31 December 2020.</p>
</div>
]]></description><pubDate>Sun, 21 Feb 2021 16:00:00 GMT</pubDate></item><item><title>Letter of Intent – Norseman Gold Project</title><link>http://www.gres.com.au/news/article/10022021-120/letter-of-intent-norseman-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/10022021-120/letter-of-intent-norseman-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Letter of Intent – Norseman Gold Project" />GR Engineering is pleased to announce that it has received a Letter of Intent from Pantoro Limited&nbsp;for the engineering, procurement and construction of a new processing plant for its 50% owned Norseman Gold Project.]]></description><pubDate>Tue, 09 Feb 2021 16:00:00 GMT</pubDate></item><item><title>FY21 Guidance Revenue</title><link>http://www.gres.com.au/news/article/02022021-120/fy21-guidance-revenue.aspx</link><guid>http://www.gres.com.au/news/article/02022021-120/fy21-guidance-revenue.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY21 Guidance Revenue" />GR Engineering is&nbsp;pleased to advise that full year revenue guidance for the year ending 30 June 2021 (FY21) is forecast to be in the range of $340 million to $360 million.]]></description><pubDate>Mon, 01 Feb 2021 16:00:00 GMT</pubDate></item><item><title>Upstream PS - Northern Endeavour FPSO Contract</title><link>http://www.gres.com.au/news/article/23122020-172/upstream-ps-northern-endeavour-fpso-contract.aspx</link><guid>http://www.gres.com.au/news/article/23122020-172/upstream-ps-northern-endeavour-fpso-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Upstream PS - Northern Endeavour FPSO Contract" /><p>GR Engineering is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions Pty Ltd&nbsp;has been awarded a one year contract with the Department of Industry, Science, Energy and Resources of the Australian Government&nbsp;to provide operations, maintenance and project services to the Northern Endeavour FPSO&nbsp;and associated infrastructure&nbsp;in preparation for a disconnection and removal of the FPSO.</p>
]]></description><pubDate>Tue, 22 Dec 2020 16:00:00 GMT</pubDate></item><item><title>Barry Sydney Patterson</title><link>http://www.gres.com.au/news/article/15122020-120/barry-sydney-patterson.aspx</link><guid>http://www.gres.com.au/news/article/15122020-120/barry-sydney-patterson.aspx</guid><description><![CDATA[GR Engineering announces that its founding Director, Mr Barry Patterson, has passed away.&nbsp;]]></description><pubDate>Mon, 14 Dec 2020 16:00:00 GMT</pubDate></item><item><title>FY20 Annual General Meeting</title><link>http://www.gres.com.au/news/article/26112020-120/fy20-annual-general-meeting.aspx</link><guid>http://www.gres.com.au/news/article/26112020-120/fy20-annual-general-meeting.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="FY20 Annual General Meeting" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) will today hold its 2020 Annual General Meeting.]]></description><pubDate>Wed, 25 Nov 2020 16:00:00 GMT</pubDate></item><item><title>2020 Annual Report</title><link>http://www.gres.com.au/news/article/09112020-122/2020-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/09112020-122/2020-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual-Report-2020-Thumbnail.jpg" alt="2020 Annual Report" />GR Engineering&#39;s Annual Report for the financial year ended 30 June 2020 is now available.&nbsp;]]></description><pubDate>Sun, 08 Nov 2020 16:00:00 GMT</pubDate></item><item><title>Contract Award – Nullagine Mill Refurbishment Project</title><link>http://www.gres.com.au/news/article/16102020-120/contract-award-nullagine-mill-refurbishment-project.aspx</link><guid>http://www.gres.com.au/news/article/16102020-120/contract-award-nullagine-mill-refurbishment-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Contract Award – Nullagine Mill Refurbishment Project" />GR Engineering is pleased to announce that it has been awarded a contract for the engineering, procurement and construction works with Millennium Minerals Ltd, a subsidiary of Novo Resources Corp.&nbsp;associated with the Nullagine Gold Project, located in the Pilbara region of Western Australia.]]></description><pubDate>Thu, 15 Oct 2020 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Wiluna Gold Operation - Concentrator</title><link>http://www.gres.com.au/news/article/06102020-170/epc-contract-wiluna-gold-operation-concentrator.aspx</link><guid>http://www.gres.com.au/news/article/06102020-170/epc-contract-wiluna-gold-operation-concentrator.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Wiluna Gold Operation - Concentrator" />GR Engineering is pleased to announce that it has been appointed as EPC contractor by Wiluna Mining Corporation&nbsp;for stage 1 works relating to the concentrator development program for its Wiluna Gold Operations located in Western Australia.]]></description><pubDate>Mon, 05 Oct 2020 16:00:00 GMT</pubDate></item><item><title>Appointment as Preferred Tenderer - Warrawoona Gold Project</title><link>http://www.gres.com.au/news/article/17092020-175/appointment-as-preferred-tenderer-warrawoona-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/17092020-175/appointment-as-preferred-tenderer-warrawoona-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Appointment as Preferred Tenderer - Warrawoona Gold Project" />GR Engineering is pleased to announce that it has been appointed preferred tenderer by Calidus&nbsp;in relation to the design and construction of the process plant and associated infrastructure for the Warrawoona Gold Project.&nbsp;]]></description><pubDate>Wed, 16 Sep 2020 16:00:00 GMT</pubDate></item><item><title>FY20 Investor Presentation</title><link>http://www.gres.com.au/news/article/31082020-120/fy20-investor-presentation.aspx</link><guid>http://www.gres.com.au/news/article/31082020-120/fy20-investor-presentation.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY20 Investor Presentation" />View GR Engineering&#39;s Financial Year 2020 Investor Presentation.&nbsp;]]></description><pubDate>Sun, 30 Aug 2020 16:00:00 GMT</pubDate></item><item><title>FY20 Financial Results</title><link>http://www.gres.com.au/news/article/25082020-120/fy20-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/25082020-120/fy20-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY20 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the financial year ended 30 June 2020 (FY20).]]></description><pubDate>Mon, 24 Aug 2020 16:00:00 GMT</pubDate></item><item><title>Lake Way Project - Funding Finalised</title><link>http://www.gres.com.au/news/article/06082020-165/lake-way-project-funding-finalised.aspx</link><guid>http://www.gres.com.au/news/article/06082020-165/lake-way-project-funding-finalised.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Lake Way Project - Funding Finalised" />GR Engineering is now pleased to announce that Salt Lake Potash has finalised its funding for the Lake Way Project. The combined value of the Contracts is approximately $107 million, which GR Engineering anticipates will be realised predominantly in FY21.]]></description><pubDate>Wed, 05 Aug 2020 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Davyhurst Restart Project</title><link>http://www.gres.com.au/news/article/15072020-169/epc-contract-davyhurst-restart-project.aspx</link><guid>http://www.gres.com.au/news/article/15072020-169/epc-contract-davyhurst-restart-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Davyhurst Restart Project" />GR Engineering&nbsp;is pleased to announce that is has been awarded an engineering, procurement and construction contract with Ora Banda Mining Limited&nbsp;associated with the restart of the existing Davyhurst Gold Processing Plant located in Western Australia.]]></description><pubDate>Tue, 14 Jul 2020 16:00:00 GMT</pubDate></item><item><title>Saracen Awards New Work to GR Engineering</title><link>http://www.gres.com.au/news/article/30062020-120/saracen-awards-new-work-to-gr-engineering.aspx</link><guid>http://www.gres.com.au/news/article/30062020-120/saracen-awards-new-work-to-gr-engineering.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Saracen Awards New Work to GR Engineering" />GR Engineering&nbsp;is pleased to announce that it has been awarded additional work by Saracen&nbsp;that has a combined value of $29 million.]]></description><pubDate>Mon, 29 Jun 2020 16:00:00 GMT</pubDate></item><item><title>$300k Donated to the Starlight Children's Foundation</title><link>http://www.gres.com.au/news/article/22062020-120/300k-donated-to-the-starlight-children-s-foundation.aspx</link><guid>http://www.gres.com.au/news/article/22062020-120/300k-donated-to-the-starlight-children-s-foundation.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/News-Thumbnail---Starlight.jpg" alt="$300k Donated to the Starlight Children's Foundation" />GR Engineering reaches $300k milestone in donations to the Starlight Children&#39;s Foundation as part of the Safety Incentive Scheme.&nbsp;]]></description><pubDate>Sun, 21 Jun 2020 16:00:00 GMT</pubDate></item><item><title>Letter of Intent - Deflector Flotation Tails Leach Plant</title><link>http://www.gres.com.au/news/article/18062020-167/letter-of-intent-deflector-flotation-tails-leach-plant.aspx</link><guid>http://www.gres.com.au/news/article/18062020-167/letter-of-intent-deflector-flotation-tails-leach-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Letter of Intent - Deflector Flotation Tails Leach Plant" />GR Engineering&nbsp;is pleased to announce that it has received a letter of intent (LOI) from Silver Lake&nbsp;Pty Ltd, a wholly owned subsidiary of Silver Lake Resources Limited, for the award of upgrade works involving the flotation tailings leach process at the Deflector gold copper operations.]]></description><pubDate>Wed, 17 Jun 2020 16:00:00 GMT</pubDate></item><item><title>Lake Way Project - Design and Construction Works</title><link>http://www.gres.com.au/news/article/15062020-165/lake-way-project-design-and-construction-works.aspx</link><guid>http://www.gres.com.au/news/article/15062020-165/lake-way-project-design-and-construction-works.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Lake Way Project - Design and Construction Works" />GR Engineering&nbsp;is pleased to announce that it has been engaged by Salt Lake Potash&nbsp;for the design and construction for the Lake Way Project.]]></description><pubDate>Sun, 14 Jun 2020 16:00:00 GMT</pubDate></item><item><title>GR Engineering Re-Opened its Offices</title><link>http://www.gres.com.au/news/article/18052020-120/gr-engineering-re-opened-its-offices.aspx</link><guid>http://www.gres.com.au/news/article/18052020-120/gr-engineering-re-opened-its-offices.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Safety_Announcement_Icon.png" alt="GR Engineering Re-Opened its Offices" /><p>We wish to keep you updated on how we are responding to the spread of the Coronavirus (COVID-19).</p>
]]></description><pubDate>Sun, 17 May 2020 16:00:00 GMT</pubDate></item><item><title>Contract Award - Upstream Production Solutions Northern Endeavour FPSO</title><link>http://www.gres.com.au/news/article/15052020-172/contract-award-upstream-production-solutions-northern-endeavour-fpso.aspx</link><guid>http://www.gres.com.au/news/article/15052020-172/contract-award-upstream-production-solutions-northern-endeavour-fpso.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Contract Award - Upstream Production Solutions Northern Endeavour FPSO" />GR Engineering&nbsp;is pleased to announce that its wholly owned oil and gas services business, Upstream Production Solutions&nbsp;has been awarded a Contract with the Department of Industry, Science, Energy and Resources of the Australian Government&nbsp; to provide operations and maintenance to the Northern Endeavour FPSO and associated infrastructure.&nbsp;]]></description><pubDate>Thu, 14 May 2020 16:00:00 GMT</pubDate></item><item><title>Sandy Ridge Project Update</title><link>http://www.gres.com.au/news/article/16042020-120/sandy-ridge-project-update.aspx</link><guid>http://www.gres.com.au/news/article/16042020-120/sandy-ridge-project-update.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Sandy-Ridge-News-Thumb.jpg" alt="Sandy Ridge Project Update" />The Sandy Ridge project involves the design, installation and commissioning of the largest air dome in the southern hemisphere.&nbsp;]]></description><pubDate>Wed, 15 Apr 2020 16:00:00 GMT</pubDate></item><item><title>Contract Award - Upstream Production Solutions</title><link>http://www.gres.com.au/news/article/03042020-172/contract-award-upstream-production-solutions.aspx</link><guid>http://www.gres.com.au/news/article/03042020-172/contract-award-upstream-production-solutions.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Contract Award - Upstream Production Solutions" />Arrowsmith Stabilisation Plant and Cliff Head Alpha Offshore Platform Facility]]></description><pubDate>Thu, 02 Apr 2020 16:00:00 GMT</pubDate></item><item><title>GR Engineering's Approach to Coronavirus </title><link>http://www.gres.com.au/news/article/27032020-120/gr-engineering-s-approach-to-coronavirus.aspx</link><guid>http://www.gres.com.au/news/article/27032020-120/gr-engineering-s-approach-to-coronavirus.aspx</guid><description><![CDATA[We wish to keep you updated on how we are responding to the spread of the Coronavirus (COVID-19).]]></description><pubDate>Thu, 26 Mar 2020 16:00:00 GMT</pubDate></item><item><title>HY20 Financial Results</title><link>http://www.gres.com.au/news/article/25022020-120/hy20-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/25022020-120/hy20-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY20 Financial Results" /><div>
<p>GR Engineering&nbsp;today announced its financial results for the half year ended 31 December 2019 (<strong>HY20</strong>).</p>
</div>
]]></description><pubDate>Mon, 24 Feb 2020 16:00:00 GMT</pubDate></item><item><title>Contract Extension - Upstream Production Solutions Blacktip Gas Field and Yelcherr Gas Plant</title><link>http://www.gres.com.au/news/article/20022020-172/contract-extension-upstream-production-solutions-blacktip-gas-field-and-yelcherr-gas-plant.aspx</link><guid>http://www.gres.com.au/news/article/20022020-172/contract-extension-upstream-production-solutions-blacktip-gas-field-and-yelcherr-gas-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Contract Extension - Upstream Production Solutions Blacktip Gas Field and Yelcherr Gas Plant" />GR Engineering is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions, has been awarded a two year extension to its maintenance services contract with Eni Australia, the operator of the Blacktip&nbsp;Gas Field and associated production infrastructure.]]></description><pubDate>Wed, 19 Feb 2020 16:00:00 GMT</pubDate></item><item><title>Letter Agreement - Upstream Production Solutions Northern Endeavour FPSO</title><link>http://www.gres.com.au/news/article/17022020-172/letter-agreement-upstream-production-solutions-northern-endeavour-fpso.aspx</link><guid>http://www.gres.com.au/news/article/17022020-172/letter-agreement-upstream-production-solutions-northern-endeavour-fpso.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Letter Agreement - Upstream Production Solutions Northern Endeavour FPSO" />GR Engineering is pleased to announce that its wholly owned subsidiary, Upstream Production Solutions has entered into an agreement with the Department of Industry, Science, Energy and Resources of the Australian Government to provide operations and maintenance services to the Northern Endeavour floating production, storage and offtake facility.]]></description><pubDate>Sun, 16 Feb 2020 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Abra Base Metals Project</title><link>http://www.gres.com.au/news/article/10022020-163/epc-contract-abra-base-metals-project.aspx</link><guid>http://www.gres.com.au/news/article/10022020-163/epc-contract-abra-base-metals-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Abra Base Metals Project" />GR Engineering Services Limited&nbsp; is pleased to announce that it has been awarded a conditional engineering, procurement and construction contract with Galena Mining Limited&#39;s subsidiary, Abra Mining Pty Ltd, for the supply of a 1.2 million tonne per annum lead sulphide floatation process plant and ancillary infrastructure for the Abra Base Metals Project located in Western Australia.]]></description><pubDate>Sun, 09 Feb 2020 16:00:00 GMT</pubDate></item><item><title>Upstream Production Solutions' Contract with Timor Sea Oil and Gas Australia Pty Ltd (Administrators Appointed)</title><link>http://www.gres.com.au/news/article/07022020-172/upstream-production-solutions-contract-with-timor-sea-oil-and-gas-australia-pty-ltd-administrators-appointed.aspx</link><guid>http://www.gres.com.au/news/article/07022020-172/upstream-production-solutions-contract-with-timor-sea-oil-and-gas-australia-pty-ltd-administrators-appointed.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="Upstream Production Solutions' Contract with Timor Sea Oil and Gas Australia Pty Ltd (Administrators Appointed)" />GR Engineering refers to its previous announcement on 1 October 2019 in relation to the status of the Operations and Maintenance Services Agreement (O&amp;M Agreement) between its wholly owned subsidiary, Upstream Production Solutions Pty Ltd (Upstream PS) and Timor Sea Oil &amp; Gas Australia Pty Ltd (Administrators Appointed) (TOGA).&nbsp;]]></description><pubDate>Thu, 06 Feb 2020 16:00:00 GMT</pubDate></item><item><title>GR Engineering Announces US$4.5M EPCM Service Agreement for the San Dimas Silver Mine in Durango, Mexico</title><link>http://www.gres.com.au/news/article/31012020-120/gr-engineering-announces-us-4-5m-epcm-service-agreement-for-the-san-dimas-silver-mine-in-durango-mexico.aspx</link><guid>http://www.gres.com.au/news/article/31012020-120/gr-engineering-announces-us-4-5m-epcm-service-agreement-for-the-san-dimas-silver-mine-in-durango-mexico.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GR Engineering Announces US$4.5M EPCM Service Agreement for the San Dimas Silver Mine in Durango, Mexico" />GR Engineering &nbsp;is pleased to announce that its wholly owned subsidiary GR Engineering Services Americas, Inc. has been appointed by First Majestic Silver Corp.&nbsp;to supply Engineering, Procurement and Construction Management (EPCM) services to its San Dimas Silver Mine in Durango, Mexico.]]></description><pubDate>Thu, 30 Jan 2020 16:00:00 GMT</pubDate></item><item><title>GR Engineering Acquires US Business</title><link>http://www.gres.com.au/news/article/16012020-173/gr-engineering-acquires-us-business.aspx</link><guid>http://www.gres.com.au/news/article/16012020-173/gr-engineering-acquires-us-business.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GR Engineering Acquires US Business" />GR Engineering&nbsp;is pleased to announce that it has entered into an agreement to acquire Hanlon Engineering &amp; Associates, Inc., (<strong>Hanlon</strong>) based in Arizona, USA.&nbsp;]]></description><pubDate>Wed, 15 Jan 2020 16:00:00 GMT</pubDate></item><item><title>EcoGraf signs GR Engineering for WA Battery Graphite Manufacturing Facility</title><link>http://www.gres.com.au/news/article/13012020-120/ecograf-signs-gr-engineering-for-wa-battery-graphite-manufacturing-facility.aspx</link><guid>http://www.gres.com.au/news/article/13012020-120/ecograf-signs-gr-engineering-for-wa-battery-graphite-manufacturing-facility.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="EcoGraf signs GR Engineering for WA Battery Graphite Manufacturing Facility" />EcoGraf&nbsp;has signed a letter of intent (LOI) with GR Engineering for an engineering, procurement and construction contract for the development of a 20,000tpa&nbsp;battery graphite facility in Western Australia.]]></description><pubDate>Sun, 12 Jan 2020 16:00:00 GMT</pubDate></item><item><title>Annual General Meeting Presentation - Outlook Statement</title><link>http://www.gres.com.au/news/article/28112019-120/annual-general-meeting-presentation-outlook-statement.aspx</link><guid>http://www.gres.com.au/news/article/28112019-120/annual-general-meeting-presentation-outlook-statement.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="Annual General Meeting Presentation - Outlook Statement" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) will today hold its 2019 Annual General Meeting.]]></description><pubDate>Wed, 27 Nov 2019 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Carosue Dam Operations Plant Expansion Project</title><link>http://www.gres.com.au/news/article/05112019-120/epc-contract-carosue-dam-operations-plant-expansion-project.aspx</link><guid>http://www.gres.com.au/news/article/05112019-120/epc-contract-carosue-dam-operations-plant-expansion-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Carosue Dam Operations Plant Expansion Project" />GR Engineering Services Limited&nbsp;is pleased to announce that it has entered into a contract with Saracen Gold Mines Pty Limited&nbsp;for the engineering design, procurement and construction of expansion works on the mineral processing plant at the Carosue Dam gold operations, situated approximately 120km&nbsp;north east of Kalgoorlie in Western Australia.]]></description><pubDate>Mon, 04 Nov 2019 16:00:00 GMT</pubDate></item><item><title>2019 Annual Report</title><link>http://www.gres.com.au/news/article/25102019-122/2019-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/25102019-122/2019-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual-Report-2019-Thumbnail.JPG" alt="2019 Annual Report" />GR Engineering Services&#39; Annual Report for the financial year ended 30 June 2019 is now available. Please click the following link to download a copy.]]></description><pubDate>Thu, 24 Oct 2019 16:00:00 GMT</pubDate></item><item><title>Timor Sea Oil and Gas Contract</title><link>http://www.gres.com.au/news/article/01102019-172/timor-sea-oil-and-gas-contract.aspx</link><guid>http://www.gres.com.au/news/article/01102019-172/timor-sea-oil-and-gas-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Timor Sea Oil and Gas Contract" />Upstream Production Solutions&#39; Contract with Timor Sea Oil and Gas Australia Pty Ltd (Administrators Appointed)]]></description><pubDate>Mon, 30 Sep 2019 16:00:00 GMT</pubDate></item><item><title>Letter of Intent Issued for EPC Contract - Woodlark Gold Project</title><link>http://www.gres.com.au/news/article/19092019-168/letter-of-intent-issued-for-epc-contract-woodlark-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/19092019-168/letter-of-intent-issued-for-epc-contract-woodlark-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Letter of Intent Issued for EPC Contract - Woodlark Gold Project" />Geopacific Resources have issued a Letter of Intent to GR Engineering for the award of the engineering, procurement, and construction (EPC) contract for the Woodlark Gold Project.&nbsp;]]></description><pubDate>Wed, 18 Sep 2019 16:00:00 GMT</pubDate></item><item><title>FY19 Financial Results</title><link>http://www.gres.com.au/news/article/26082019-120/fy19-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/26082019-120/fy19-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY19 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announces its financial results for the financial year ended 30 June 2019 (FY19).]]></description><pubDate>Sun, 25 Aug 2019 16:00:00 GMT</pubDate></item><item><title>Resignation and Appointment of Chief Financial Officer and Company Secretary</title><link>http://www.gres.com.au/news/article/01042019-120/resignation-and-appointment-of-chief-financial-officer-and-company-secretary.aspx</link><guid>http://www.gres.com.au/news/article/01042019-120/resignation-and-appointment-of-chief-financial-officer-and-company-secretary.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Appointment-Study-Manager-or-Board-Member-2019.jpg" alt="Resignation and Appointment of Chief Financial Officer and Company Secretary" />GR Engineering is pleased to confirm the appointment of Mr Omesh Motiwalla as the Company&#39;s Chief Financial Officer and Company Secretary, effective 16 April 2019.]]></description><pubDate>Sun, 31 Mar 2019 16:00:00 GMT</pubDate></item><item><title>Half Yearly Reports and Accounts HY19</title><link>http://www.gres.com.au/news/article/25022019-120/half-yearly-reports-and-accounts-hy19.aspx</link><guid>http://www.gres.com.au/news/article/25022019-120/half-yearly-reports-and-accounts-hy19.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="Half Yearly Reports and Accounts HY19" />Half Yearly Reports and Accounts HY19]]></description><pubDate>Sun, 24 Feb 2019 16:00:00 GMT</pubDate></item><item><title>Update - Eastern Goldfields Limited (EGS)</title><link>http://www.gres.com.au/news/article/14022019-120/update-eastern-goldfields-limited-egs.aspx</link><guid>http://www.gres.com.au/news/article/14022019-120/update-eastern-goldfields-limited-egs.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Update - Eastern Goldfields Limited (EGS)" />Eastern Goldfields Limited (Administrators Appointed)]]></description><pubDate>Wed, 13 Feb 2019 16:00:00 GMT</pubDate></item><item><title>Award of Carrapateena Northern Wellfield Water Supply System EPC Contract</title><link>http://www.gres.com.au/news/article/05022019-161/award-of-carrapateena-northern-wellfield-water-supply-system-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/05022019-161/award-of-carrapateena-northern-wellfield-water-supply-system-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Award of Carrapateena Northern Wellfield Water Supply System EPC Contract" />Award of Carrapateena Northern Wellfield Water Supply System EPC Contract]]></description><pubDate>Mon, 04 Feb 2019 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Sandy Ridge Project</title><link>http://www.gres.com.au/news/article/21012019-120/epc-contract-sandy-ridge-project.aspx</link><guid>http://www.gres.com.au/news/article/21012019-120/epc-contract-sandy-ridge-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Sandy Ridge Project" />Award of Sandy Ridge Project EPC Contract]]></description><pubDate>Sun, 20 Jan 2019 16:00:00 GMT</pubDate></item><item><title>Update - Eastern Goldfields Limited</title><link>http://www.gres.com.au/news/article/28112018-120/update-eastern-goldfields-limited.aspx</link><guid>http://www.gres.com.au/news/article/28112018-120/update-eastern-goldfields-limited.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Update - Eastern Goldfields Limited" /><strong>Update - Eastern Goldfields Limited</strong>]]></description><pubDate>Tue, 27 Nov 2018 16:00:00 GMT</pubDate></item><item><title>Annual General Meeting</title><link>http://www.gres.com.au/news/article/22112018-120/annual-general-meeting.aspx</link><guid>http://www.gres.com.au/news/article/22112018-120/annual-general-meeting.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="Annual General Meeting" /><p>Annual General Meeting presentation - outlook statement</p>
]]></description><pubDate>Wed, 21 Nov 2018 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Thunderbird Mineral Sands Contract</title><link>http://www.gres.com.au/news/article/12112018-120/epc-contract-thunderbird-mineral-sands-contract.aspx</link><guid>http://www.gres.com.au/news/article/12112018-120/epc-contract-thunderbird-mineral-sands-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Thunderbird Mineral Sands Contract" /><strong>EPC Contract &ndash; Thunderbird Mineral Sands Contract</strong>]]></description><pubDate>Sun, 11 Nov 2018 16:00:00 GMT</pubDate></item><item><title>EPC Contract – Fungoni Mineral Sands Project</title><link>http://www.gres.com.au/news/article/22102018-120/epc-contract-fungoni-mineral-sands-project.aspx</link><guid>http://www.gres.com.au/news/article/22102018-120/epc-contract-fungoni-mineral-sands-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – Fungoni Mineral Sands Project" />EPC Contract &ndash; Fungoni Mineral Sands Project]]></description><pubDate>Sun, 21 Oct 2018 16:00:00 GMT</pubDate></item><item><title>2018 Annual Report</title><link>http://www.gres.com.au/news/article/15102018-122/2018-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/15102018-122/2018-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2018_Thumbnail.png" alt="2018 Annual Report" />2018 Annual Report]]></description><pubDate>Sun, 14 Oct 2018 16:00:00 GMT</pubDate></item><item><title>Davyhurst Gold Project Refurbishment Contract - Settlement Deed Variation</title><link>http://www.gres.com.au/news/article/04102018-120/davyhurst-gold-project-refurbishment-contract-settlement-deed-variation.aspx</link><guid>http://www.gres.com.au/news/article/04102018-120/davyhurst-gold-project-refurbishment-contract-settlement-deed-variation.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Davyhurst Gold Project Refurbishment Contract - Settlement Deed Variation" /><strong>Davyhurst Gold Project Refurbishment Contract - Settlement Deed Variation</strong>]]></description><pubDate>Wed, 03 Oct 2018 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Fosterville Paste Backfill Plant</title><link>http://www.gres.com.au/news/article/29082018-159/epc-contract-fosterville-paste-backfill-plant.aspx</link><guid>http://www.gres.com.au/news/article/29082018-159/epc-contract-fosterville-paste-backfill-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Fosterville Paste Backfill Plant" />EPC Contract - Fosterville Paste Backfill Plant]]></description><pubDate>Tue, 28 Aug 2018 16:00:00 GMT</pubDate></item><item><title>FY18 Financial Results</title><link>http://www.gres.com.au/news/article/22082018-120/fy18-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/22082018-120/fy18-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY18 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announced its financial results for the financial year ended 30 June 2018 (FY18).]]></description><pubDate>Tue, 21 Aug 2018 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Carosue Dam Paste Backfill Plant</title><link>http://www.gres.com.au/news/article/21082018-160/epc-contract-carosue-dam-paste-backfill-plant.aspx</link><guid>http://www.gres.com.au/news/article/21082018-160/epc-contract-carosue-dam-paste-backfill-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Carosue Dam Paste Backfill Plant" />EPC Contract - Carosue Dam Paste Backfill Plant]]></description><pubDate>Mon, 20 Aug 2018 16:00:00 GMT</pubDate></item><item><title>Settlement Davyhurst Gold Project Refurbishment Contract </title><link>http://www.gres.com.au/news/article/13082018-120/settlement-davyhurst-gold-project-refurbishment-contract.aspx</link><guid>http://www.gres.com.au/news/article/13082018-120/settlement-davyhurst-gold-project-refurbishment-contract.aspx</guid><description><![CDATA[<p>Settlement Davyhurst Gold Project Refurbishment Contract</p>
]]></description><pubDate>Sun, 12 Aug 2018 16:00:00 GMT</pubDate></item><item><title>Appointment as Preferred Tenderer - Karlawinda Gold Project</title><link>http://www.gres.com.au/news/article/23042018-120/appointment-as-preferred-tenderer-karlawinda-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/23042018-120/appointment-as-preferred-tenderer-karlawinda-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Appointment as Preferred Tenderer - Karlawinda Gold Project" />Appointment as Preferred Tenderer - Karlawinda Gold Project]]></description><pubDate>Sun, 22 Apr 2018 16:00:00 GMT</pubDate></item><item><title>Hemerdon Tungsten and Tin Project EPC Contract Settlement</title><link>http://www.gres.com.au/news/article/20042018-120/hemerdon-tungsten-and-tin-project-epc-contract-settlement.aspx</link><guid>http://www.gres.com.au/news/article/20042018-120/hemerdon-tungsten-and-tin-project-epc-contract-settlement.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Hemerson_Settlement.jpg" alt="Hemerdon Tungsten and Tin Project EPC Contract Settlement" />Hemerdon Tungsten and Tin Project EPC Contract Settlement]]></description><pubDate>Thu, 19 Apr 2018 16:00:00 GMT</pubDate></item><item><title>Dacian Gold Limited Pours First Gold at Mt Morgans</title><link>http://www.gres.com.au/news/article/03042018-120/dacian-gold-limited-pours-first-gold-at-mt-morgans.aspx</link><guid>http://www.gres.com.au/news/article/03042018-120/dacian-gold-limited-pours-first-gold-at-mt-morgans.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Mt_Morgan.jpg" alt="Dacian Gold Limited Pours First Gold at Mt Morgans" />Dacian Gold Limited Pours First Gold at Mt Morgans]]></description><pubDate>Mon, 02 Apr 2018 16:00:00 GMT</pubDate></item><item><title>HY18 Half Year Financial Results</title><link>http://www.gres.com.au/news/article/26022018-120/hy18-half-year-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/26022018-120/hy18-half-year-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY18 Half Year Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announced its Half Year Financial Report for the Half Year ended 31 December 2017 (HY18).]]></description><pubDate>Sun, 25 Feb 2018 16:00:00 GMT</pubDate></item><item><title>Update - Eastern Goldfields Limited Recovery Proceedings</title><link>http://www.gres.com.au/news/article/25012018-120/update-eastern-goldfields-limited-recovery-proceedings.aspx</link><guid>http://www.gres.com.au/news/article/25012018-120/update-eastern-goldfields-limited-recovery-proceedings.aspx</guid><description><![CDATA[<p><strong>Update - Eastern Goldfields Limited Recovery Proceedings</strong></p>

<p>&nbsp;</p>

<p><a href="https://www.asx.com.au/asx/share-price-research/company/GNG" target="_blank">ASX announcement:&nbsp;https://www.asx.com.au/asxpdf/20180125/pdf/43r15ww51y92q5.pdf</a></p>

<p>&nbsp;</p>
]]></description><pubDate>Wed, 24 Jan 2018 16:00:00 GMT</pubDate></item><item><title>Annual Report 2017</title><link>http://www.gres.com.au/news/article/12102017-120/annual-report-2017.aspx</link><guid>http://www.gres.com.au/news/article/12102017-120/annual-report-2017.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/AnnualReport2017_NewsPic.jpg" alt="Annual Report 2017" /><p>GR Engineering Services&#39; Annual Report for the financial year ended 30 June 2017&nbsp;is now available.</p>
]]></description><pubDate>Wed, 11 Oct 2017 16:00:00 GMT</pubDate></item><item><title>2017 Annual Report</title><link>http://www.gres.com.au/news/article/12102017-122/2017-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/12102017-122/2017-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Cover_GR_Engineering_2017_Annual_Report_2.jpg" alt="2017 Annual Report" />Annual Report 2017]]></description><pubDate>Wed, 11 Oct 2017 16:00:00 GMT</pubDate></item><item><title>FY17 Financial Results</title><link>http://www.gres.com.au/news/article/24082017-120/fy17-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/24082017-120/fy17-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY17 Financial Results" />GR Engineering Services Limited (ASX:GNG) (GR Engineering or Company) today announced its financial results for the financial year ended 30 June 2017 (FY17).]]></description><pubDate>Wed, 23 Aug 2017 16:00:00 GMT</pubDate></item><item><title>Proceedings - Davyhurst Gold Project Refurbishment Contract</title><link>http://www.gres.com.au/news/article/11072017-120/proceedings-davyhurst-gold-project-refurbishment-contract.aspx</link><guid>http://www.gres.com.au/news/article/11072017-120/proceedings-davyhurst-gold-project-refurbishment-contract.aspx</guid><description><![CDATA[Proceedings - Davyhurst Gold Project Refurbishment Contract]]></description><pubDate>Mon, 10 Jul 2017 16:00:00 GMT</pubDate></item><item><title>Entry into Dalgaranga Gold Project EPC Contract</title><link>http://www.gres.com.au/news/article/05072017-120/entry-into-dalgaranga-gold-project-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/05072017-120/entry-into-dalgaranga-gold-project-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Entry into Dalgaranga Gold Project EPC Contract" />Entry into Dalgaranga Gold Project EPC Contract]]></description><pubDate>Tue, 04 Jul 2017 16:00:00 GMT</pubDate></item><item><title>Award of Sunrise Dam Recovery Enhancement Project EPC Contract</title><link>http://www.gres.com.au/news/article/30062017-120/award-of-sunrise-dam-recovery-enhancement-project-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/30062017-120/award-of-sunrise-dam-recovery-enhancement-project-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Award of Sunrise Dam Recovery Enhancement Project EPC Contract" />Award of Sunrise Dam Recovery Enhancement Project EPC Contract]]></description><pubDate>Thu, 29 Jun 2017 16:00:00 GMT</pubDate></item><item><title>EPC Contract - Mt Morgans Gold Project</title><link>http://www.gres.com.au/news/article/19042017-120/epc-contract-mt-morgans-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/19042017-120/epc-contract-mt-morgans-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract - Mt Morgans Gold Project" />EPC Contract - Mt Morgans Gold Project]]></description><pubDate>Tue, 18 Apr 2017 16:00:00 GMT</pubDate></item><item><title>Half Yearly Reports and Accounts HY17</title><link>http://www.gres.com.au/news/article/27022017-120/half-yearly-reports-and-accounts-hy17.aspx</link><guid>http://www.gres.com.au/news/article/27022017-120/half-yearly-reports-and-accounts-hy17.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="Half Yearly Reports and Accounts HY17" /><p>GR Engineering Services Limited&#39;s (<strong><a href="http://www.asx.com.au/asx/share-price-research/company/GNG" target="_blank">ASX:GNG</a></strong>) financial results for the half year ended 31 December 2016 (HY17).</p>
]]></description><pubDate>Sun, 26 Feb 2017 16:00:00 GMT</pubDate></item><item><title>2016 Annual Report</title><link>http://www.gres.com.au/news/article/06102016-122/2016-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/06102016-122/2016-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2016_Thumbnail.png" alt="2016 Annual Report" /><p><a href="/sites/grescomau/assets/public/Image/News/2016_GRES_Annual_Report.pdf" target="_blank">2016 Annual Report</a></p>
]]></description><pubDate>Wed, 05 Oct 2016 16:00:00 GMT</pubDate></item><item><title>Board Appointment - Phil Lockyer</title><link>http://www.gres.com.au/news/article/04102016-120/board-appointment-phil-lockyer.aspx</link><guid>http://www.gres.com.au/news/article/04102016-120/board-appointment-phil-lockyer.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Board_Changes_Icon_001-100.jpg" alt="Board Appointment - Phil Lockyer" /><p>Board Appointment - Phil Lockyer</p>
]]></description><pubDate>Mon, 03 Oct 2016 16:00:00 GMT</pubDate></item><item><title>EPC Contract Award - Davyhurst</title><link>http://www.gres.com.au/news/article/23092016-120/epc-contract-award-davyhurst.aspx</link><guid>http://www.gres.com.au/news/article/23092016-120/epc-contract-award-davyhurst.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract Award - Davyhurst" /><p>EPC Contract Award - Davyhurst</p>
]]></description><pubDate>Thu, 22 Sep 2016 16:00:00 GMT</pubDate></item><item><title>Entry into $36 million EPC Contract</title><link>http://www.gres.com.au/news/article/11072016-120/entry-into-36-million-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/11072016-120/entry-into-36-million-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Entry into $36 million EPC Contract" /><p>Entry into $36 million EPC Contract</p>
]]></description><pubDate>Sun, 10 Jul 2016 16:00:00 GMT</pubDate></item><item><title>UPS Enters into Contract for Australia Pacific LNG Project</title><link>http://www.gres.com.au/news/article/10052016-172/ups-enters-into-contract-for-australia-pacific-lng-project.aspx</link><guid>http://www.gres.com.au/news/article/10052016-172/ups-enters-into-contract-for-australia-pacific-lng-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="UPS Enters into Contract for Australia Pacific LNG Project" /><p>UPS Enters into Contract for Australia Pacific LNG Project</p>
]]></description><pubDate>Mon, 09 May 2016 16:00:00 GMT</pubDate></item><item><title>UPS Operations and Maintenance Services Agreement for the Laminaria-Corallina Oil Field</title><link>http://www.gres.com.au/news/article/09052016-172/ups-operations-and-maintenance-services-agreement-for-the-laminaria-corallina-oil-field.aspx</link><guid>http://www.gres.com.au/news/article/09052016-172/ups-operations-and-maintenance-services-agreement-for-the-laminaria-corallina-oil-field.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="UPS Operations and Maintenance Services Agreement for the Laminaria-Corallina Oil Field" /><p>Upstream Production Solutions enters into&nbsp;Operations and Maintenance Services Agreement for the Laminaria-Corallina Oil Field</p>
]]></description><pubDate>Sun, 08 May 2016 16:00:00 GMT</pubDate></item><item><title>Appointment of Study Manager for the Mulga Rock Definitive Feasibility Study</title><link>http://www.gres.com.au/news/article/03032016-120/appointment-of-study-manager-for-the-mulga-rock-definitive-feasibility-study.aspx</link><guid>http://www.gres.com.au/news/article/03032016-120/appointment-of-study-manager-for-the-mulga-rock-definitive-feasibility-study.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Appointment-Study-Manager-or-Board-Member-2019.jpg" alt="Appointment of Study Manager for the Mulga Rock Definitive Feasibility Study" /><p>Appointment of GR Engineering Services Limited as study manager for the Mulga Rock Definitive Feasibility Study</p>
]]></description><pubDate>Wed, 02 Mar 2016 16:00:00 GMT</pubDate></item><item><title>Half Yearly Results</title><link>http://www.gres.com.au/news/article/23022016-120/half-yearly-results.aspx</link><guid>http://www.gres.com.au/news/article/23022016-120/half-yearly-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/sites/grescomau/assets/public/Image/HY15.bmp" alt="Half Yearly Results" /><p>HY16 Financial Results</p>
]]></description><pubDate>Mon, 22 Feb 2016 16:00:00 GMT</pubDate></item><item><title>Award of Gruyere Gold Project Feasibility Study</title><link>http://www.gres.com.au/news/article/11022016-120/award-of-gruyere-gold-project-feasibility-study.aspx</link><guid>http://www.gres.com.au/news/article/11022016-120/award-of-gruyere-gold-project-feasibility-study.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Award of Gruyere Gold Project Feasibility Study" /><p>Award of Gruyere Gold Project Feasibility Study</p>
]]></description><pubDate>Wed, 10 Feb 2016 16:00:00 GMT</pubDate></item><item><title>Deflector Project Design and Construction Works</title><link>http://www.gres.com.au/news/article/10112015-120/deflector-project-design-and-construction-works.aspx</link><guid>http://www.gres.com.au/news/article/10112015-120/deflector-project-design-and-construction-works.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Deflector Project Design and Construction Works" /><p>Deflector Project Design and Construction Works</p>
]]></description><pubDate>Mon, 09 Nov 2015 16:00:00 GMT</pubDate></item><item><title>Australia's Paydirt Article Nov 2015</title><link>http://www.gres.com.au/news/article/05112015-120/australia-s-paydirt-article-nov-2015.aspx</link><guid>http://www.gres.com.au/news/article/05112015-120/australia-s-paydirt-article-nov-2015.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/sites/grescomau/assets/public/Image/News/PayDirt_4.jpg" alt="Australia's Paydirt Article Nov 2015" /><p>
	The following article appeared in the November 2015 edition of Australia&#39;s Paydirt.</p>
]]></description><pubDate>Wed, 04 Nov 2015 16:00:00 GMT</pubDate></item><item><title>2015 Annual Report</title><link>http://www.gres.com.au/news/article/09102015-122/2015-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/09102015-122/2015-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/AR.jpg" alt="2015 Annual Report" /><p>2015 Annual Report</p>
]]></description><pubDate>Thu, 08 Oct 2015 16:00:00 GMT</pubDate></item><item><title>Investor Presentation - FY15 Financial Results</title><link>http://www.gres.com.au/news/article/01092015-120/investor-presentation-fy15-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/01092015-120/investor-presentation-fy15-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/sites/grescomau/assets/public/Image/News/Thumbs.bmp" alt="Investor Presentation - FY15 Financial Results" /><p>Investor Presentation - FY15 Financial Results</p>
]]></description><pubDate>Mon, 31 Aug 2015 16:00:00 GMT</pubDate></item><item><title>FY15 Financial Results</title><link>http://www.gres.com.au/news/article/21082015-120/fy15-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/21082015-120/fy15-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY15 Financial Results" /><p>GR&nbsp;Engineering today released its audited financial results for the financial year ended 30 June 2015.</p>
]]></description><pubDate>Thu, 20 Aug 2015 16:00:00 GMT</pubDate></item><item><title>Entry into EPC contract - Forrestania Mill Recovery Enhancement Project</title><link>http://www.gres.com.au/news/article/20072015-120/entry-into-epc-contract-forrestania-mill-recovery-enhancement-project.aspx</link><guid>http://www.gres.com.au/news/article/20072015-120/entry-into-epc-contract-forrestania-mill-recovery-enhancement-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Entry into EPC contract - Forrestania Mill Recovery Enhancement Project" /><p>Entry into EPC contract - Forrestania Mill Recovery Enhancement Project</p>
]]></description><pubDate>Sun, 19 Jul 2015 16:00:00 GMT</pubDate></item><item><title>Entry into $12 million EPC contract - Nova Nickel Project Non-Process Infrastructure</title><link>http://www.gres.com.au/news/article/16072015-120/entry-into-12-million-epc-contract-nova-nickel-project-non-process-infrastructure.aspx</link><guid>http://www.gres.com.au/news/article/16072015-120/entry-into-12-million-epc-contract-nova-nickel-project-non-process-infrastructure.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Entry into $12 million EPC contract - Nova Nickel Project Non-Process Infrastructure" /><p>Entry into $12 million EPC contract - Nova Nickel Project Non-Process Infrastructure</p>
]]></description><pubDate>Wed, 15 Jul 2015 16:00:00 GMT</pubDate></item><item><title>Entry into $114m EPC Contract - Nova Nickel Project</title><link>http://www.gres.com.au/news/article/05062015-120/entry-into-114m-epc-contract-nova-nickel-project.aspx</link><guid>http://www.gres.com.au/news/article/05062015-120/entry-into-114m-epc-contract-nova-nickel-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Entry into $114m EPC Contract - Nova Nickel Project" /><p>Entry into $114m EPC Contract - Nova Nickel Project</p>
]]></description><pubDate>Thu, 04 Jun 2015 16:00:00 GMT</pubDate></item><item><title>Appointment as Preferred Tenderer - Nova Nickel Project</title><link>http://www.gres.com.au/news/article/30032015-120/appointment-as-preferred-tenderer-nova-nickel-project.aspx</link><guid>http://www.gres.com.au/news/article/30032015-120/appointment-as-preferred-tenderer-nova-nickel-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Appointment as Preferred Tenderer - Nova Nickel Project" /><p>Appointment as Preferred Tenderer - Nova Nickel Project</p>
]]></description><pubDate>Sun, 29 Mar 2015 16:00:00 GMT</pubDate></item><item><title>HY15 Financial Results</title><link>http://www.gres.com.au/news/article/23022015-120/hy15-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/23022015-120/hy15-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY15 Financial Results" /><p>HY15 Financial Results</p>
]]></description><pubDate>Sun, 22 Feb 2015 16:00:00 GMT</pubDate></item><item><title>Commencement of Keysbrook Mineral Sands Project</title><link>http://www.gres.com.au/news/article/04122014-120/commencement-of-keysbrook-mineral-sands-project.aspx</link><guid>http://www.gres.com.au/news/article/04122014-120/commencement-of-keysbrook-mineral-sands-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Commencement of Keysbrook Mineral Sands Project" /><p>Commencement of Keysbrook Mineral Sands Project</p>
]]></description><pubDate>Wed, 03 Dec 2014 16:00:00 GMT</pubDate></item><item><title>Board Changes</title><link>http://www.gres.com.au/news/article/02122014-120/board-changes.aspx</link><guid>http://www.gres.com.au/news/article/02122014-120/board-changes.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Board_Changes_Icon_001-100.jpg" alt="Board Changes" /><p>Board Changes</p>
]]></description><pubDate>Mon, 01 Dec 2014 16:00:00 GMT</pubDate></item><item><title>Keysbrook Mineral Sands Project</title><link>http://www.gres.com.au/news/article/19112014-120/keysbrook-mineral-sands-project.aspx</link><guid>http://www.gres.com.au/news/article/19112014-120/keysbrook-mineral-sands-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Keysbrook Mineral Sands Project" /><div>Entry into conditional $54.6 million EPC Contract Keysbrook Mineral Sands Project</div>
]]></description><pubDate>Tue, 18 Nov 2014 16:00:00 GMT</pubDate></item><item><title>Wetar Copper Project Expansion EPCM Contract</title><link>http://www.gres.com.au/news/article/10112014-120/wetar-copper-project-expansion-epcm-contract.aspx</link><guid>http://www.gres.com.au/news/article/10112014-120/wetar-copper-project-expansion-epcm-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Wetar Copper Project Expansion EPCM Contract" /><p>Wetar Copper Project Expansion EPCM Contract</p>
]]></description><pubDate>Sun, 09 Nov 2014 16:00:00 GMT</pubDate></item><item><title>2014 Annual Report</title><link>http://www.gres.com.au/news/article/10102014-122/2014-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/10102014-122/2014-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2014_Thumbnail.jpg" alt="2014 Annual Report" /><p>2014 Annual Report</p>
]]></description><pubDate>Thu, 09 Oct 2014 16:00:00 GMT</pubDate></item><item><title>Memorandum of Understanding - Deflector Project</title><link>http://www.gres.com.au/news/article/09102014-120/memorandum-of-understanding-deflector-project.aspx</link><guid>http://www.gres.com.au/news/article/09102014-120/memorandum-of-understanding-deflector-project.aspx</guid><description><![CDATA[<p>Memorandum of Understanding &ndash; Deflector Gold, Copper &amp; Silver Project</p>
]]></description><pubDate>Wed, 08 Oct 2014 16:00:00 GMT</pubDate></item><item><title>Investor Presentation</title><link>http://www.gres.com.au/news/article/04092014-120/investor-presentation.aspx</link><guid>http://www.gres.com.au/news/article/04092014-120/investor-presentation.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="Investor Presentation" /><p>Investor Presentation</p>
]]></description><pubDate>Wed, 03 Sep 2014 16:00:00 GMT</pubDate></item><item><title>FY14 Financial Results</title><link>http://www.gres.com.au/news/article/26082014-120/fy14-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/26082014-120/fy14-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY14 Financial Results" /><p>GR Engineering is pleased to release its FY14 financial results.</p>
]]></description><pubDate>Mon, 25 Aug 2014 16:00:00 GMT</pubDate></item><item><title>HY14 Financial Results</title><link>http://www.gres.com.au/news/article/24022014-120/hy14-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/24022014-120/hy14-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY14 Financial Results" /><p>HY14 Financial Results</p>
]]></description><pubDate>Sun, 23 Feb 2014 16:00:00 GMT</pubDate></item><item><title>GR Engineering Acquires Leading Oil and Gas Services Business</title><link>http://www.gres.com.au/news/article/13122013-120/gr-engineering-acquires-leading-oil-and-gas-services-business.aspx</link><guid>http://www.gres.com.au/news/article/13122013-120/gr-engineering-acquires-leading-oil-and-gas-services-business.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Upstream-PS-Announcement-Icon.jpg" alt="GR Engineering Acquires Leading Oil and Gas Services Business" /><p>GR Engineering Acquires Leading Oil and Gas Services Business</p>
]]></description><pubDate>Thu, 12 Dec 2013 16:00:00 GMT</pubDate></item><item><title>Notice of Preferred Contractor - Keysbrook Mineral Sands Project</title><link>http://www.gres.com.au/news/article/28102013-120/notice-of-preferred-contractor-keysbrook-mineral-sands-project.aspx</link><guid>http://www.gres.com.au/news/article/28102013-120/notice-of-preferred-contractor-keysbrook-mineral-sands-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Notice of Preferred Contractor - Keysbrook Mineral Sands Project" /><p>Notice of Preferred Contractor - Keysbrook Mineral Sands Project</p>
]]></description><pubDate>Sun, 27 Oct 2013 16:00:00 GMT</pubDate></item><item><title>Notice of Annual General Meeting</title><link>http://www.gres.com.au/news/article/01102013-120/notice-of-annual-general-meeting.aspx</link><guid>http://www.gres.com.au/news/article/01102013-120/notice-of-annual-general-meeting.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="Notice of Annual General Meeting" /><p>11:00am, 12 November 2013<br />
Empire Bar Function Room<br />
220 Great Eastern Hwy, Rivervale, WA</p>
]]></description><pubDate>Mon, 30 Sep 2013 16:00:00 GMT</pubDate></item><item><title>2013 Annual Report</title><link>http://www.gres.com.au/news/article/01102013-122/2013-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/01102013-122/2013-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2013_Thumbnail.jpg" alt="2013 Annual Report" /><p>2013 Annual Report</p>
]]></description><pubDate>Mon, 30 Sep 2013 16:00:00 GMT</pubDate></item><item><title>FY13 Financial Results</title><link>http://www.gres.com.au/news/article/22082013-120/fy13-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/22082013-120/fy13-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY13 Financial Results" /><p>FY13 Financial Results</p>
]]></description><pubDate>Wed, 21 Aug 2013 16:00:00 GMT</pubDate></item><item><title>Andy Well Processing Plant Completed Under Budget and Ahead of Schedule</title><link>http://www.gres.com.au/news/article/29072013-120/andy-well-processing-plant-completed-under-budget-and-ahead-of-schedule.aspx</link><guid>http://www.gres.com.au/news/article/29072013-120/andy-well-processing-plant-completed-under-budget-and-ahead-of-schedule.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Andy Well Processing Plant Completed Under Budget and Ahead of Schedule" /><ul>
	<li><b><font face="Arial">Processing plant construction completed under budget and ahead of schedule</font></b></li>
	<li align="LEFT"><b><font face="Arial">Commissioning nearing completion and ahead of schedule</font></b></li>
	<li><b><font face="Arial">Treatment of stockpiled open pit and underground ore commenced</font></b></li>
</ul>
]]></description><pubDate>Sun, 28 Jul 2013 16:00:00 GMT</pubDate></item><item><title>Board and Management Restructure</title><link>http://www.gres.com.au/news/article/26062013-120/board-and-management-restructure.aspx</link><guid>http://www.gres.com.au/news/article/26062013-120/board-and-management-restructure.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Board_Changes_Icon_001-100.jpg" alt="Board and Management Restructure" /><p>Board and Management Restructure</p>
]]></description><pubDate>Tue, 25 Jun 2013 16:00:00 GMT</pubDate></item><item><title>Commencement of Hemerdon Tungsten and Tin Project EPC Contract</title><link>http://www.gres.com.au/news/article/12062013-120/commencement-of-hemerdon-tungsten-and-tin-project-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/12062013-120/commencement-of-hemerdon-tungsten-and-tin-project-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Commencement of Hemerdon Tungsten and Tin Project EPC Contract" />Further to its ASX release of 6 March 2013, GR Engineering Services Limited (ASX:GNG) (GR Engineering)]]></description><pubDate>Tue, 11 Jun 2013 16:00:00 GMT</pubDate></item><item><title>Execution of Lump Sum Contract</title><link>http://www.gres.com.au/news/article/26032013-120/execution-of-lump-sum-contract.aspx</link><guid>http://www.gres.com.au/news/article/26032013-120/execution-of-lump-sum-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Execution of Lump Sum Contract" />Execution of Lump Sum Contract]]></description><pubDate>Mon, 25 Mar 2013 16:00:00 GMT</pubDate></item><item><title>Award of Conditional £75 million EPC Contract</title><link>http://www.gres.com.au/news/article/06032013-120/award-of-conditional-75-million-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/06032013-120/award-of-conditional-75-million-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Award of Conditional £75 million EPC Contract" />Award of Conditional &pound;75 million EPC Contract Hemerdon Tungsten and Tin Project]]></description><pubDate>Tue, 05 Mar 2013 16:00:00 GMT</pubDate></item><item><title>HY13 Financial Results</title><link>http://www.gres.com.au/news/article/26022013-120/hy13-financial-results.aspx</link><guid>http://www.gres.com.au/news/article/26022013-120/hy13-financial-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="HY13 Financial Results" />HY13 Financial Results]]></description><pubDate>Mon, 25 Feb 2013 16:00:00 GMT</pubDate></item><item><title>Award of $16 million EPC Contract</title><link>http://www.gres.com.au/news/article/25022013-160/award-of-16-million-epc-contract.aspx</link><guid>http://www.gres.com.au/news/article/25022013-160/award-of-16-million-epc-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Award of $16 million EPC Contract" />Award of $16 million EPC Contract Carosue Dam Tertiary Crushing Project]]></description><pubDate>Sun, 24 Feb 2013 16:00:00 GMT</pubDate></item><item><title>Contract Execution - Andy Well Processing Plant</title><link>http://www.gres.com.au/news/article/04012013-120/contract-execution-andy-well-processing-plant.aspx</link><guid>http://www.gres.com.au/news/article/04012013-120/contract-execution-andy-well-processing-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Contract Execution - Andy Well Processing Plant" />Contract Execution - Andy Well Processing Plant]]></description><pubDate>Thu, 03 Jan 2013 16:00:00 GMT</pubDate></item><item><title>AGM Presentation</title><link>http://www.gres.com.au/news/article/03122012-120/agm-presentation.aspx</link><guid>http://www.gres.com.au/news/article/03122012-120/agm-presentation.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="AGM Presentation" />AGM Presentation]]></description><pubDate>Sun, 02 Dec 2012 16:00:00 GMT</pubDate></item><item><title>Earnings Update</title><link>http://www.gres.com.au/news/article/19112012-120/earnings-update.aspx</link><guid>http://www.gres.com.au/news/article/19112012-120/earnings-update.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="Earnings Update" />Earnings Update]]></description><pubDate>Sun, 18 Nov 2012 16:00:00 GMT</pubDate></item><item><title>2012 Annual Report</title><link>http://www.gres.com.au/news/article/23102012-122/2012-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/23102012-122/2012-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2012_Thumbnail.jpg" alt="2012 Annual Report" /><p>2012 Annual Report</p>
]]></description><pubDate>Mon, 22 Oct 2012 16:00:00 GMT</pubDate></item><item><title>Notice of Annual General Meeting - 2012</title><link>http://www.gres.com.au/news/article/22102012-120/notice-of-annual-general-meeting-2012.aspx</link><guid>http://www.gres.com.au/news/article/22102012-120/notice-of-annual-general-meeting-2012.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Annual-General-Meeting-Icon-2019.jpg" alt="Notice of Annual General Meeting - 2012" />Notice of Annual General Meeting - 2012]]></description><pubDate>Sun, 21 Oct 2012 16:00:00 GMT</pubDate></item><item><title>Settlement of Arbitration Proceedings</title><link>http://www.gres.com.au/news/article/10102012-120/settlement-of-arbitration-proceedings.aspx</link><guid>http://www.gres.com.au/news/article/10102012-120/settlement-of-arbitration-proceedings.aspx</guid><description><![CDATA[Settlement of Arbitration Proceedings]]></description><pubDate>Tue, 09 Oct 2012 16:00:00 GMT</pubDate></item><item><title>Andy Well Gold Project - Notice of Preferred Contractor</title><link>http://www.gres.com.au/news/article/30072012-120/andy-well-gold-project-notice-of-preferred-contractor.aspx</link><guid>http://www.gres.com.au/news/article/30072012-120/andy-well-gold-project-notice-of-preferred-contractor.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Andy Well Gold Project - Notice of Preferred Contractor" />GR Engineering is pleased to advise that it has been issued with a notice of preferred contractor by Doray Minerals Limited (ASX:DRM) (Doray) in relation to the engineering, procurement and construction (EPC) contract for the processing plant for Doray&rsquo;s Andy Well Gold Project near Meekatharra in Western Australia.]]></description><pubDate>Sun, 29 Jul 2012 16:00:00 GMT</pubDate></item><item><title>Company Update</title><link>http://www.gres.com.au/news/article/16052012-120/company-update.aspx</link><guid>http://www.gres.com.au/news/article/16052012-120/company-update.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="Company Update" />Operational Performance and Financial Results Guidance]]></description><pubDate>Tue, 15 May 2012 16:00:00 GMT</pubDate></item><item><title>Trading Update</title><link>http://www.gres.com.au/news/article/10052012-120/trading-update.aspx</link><guid>http://www.gres.com.au/news/article/10052012-120/trading-update.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="Trading Update" />Trading Update]]></description><pubDate>Wed, 09 May 2012 16:00:00 GMT</pubDate></item><item><title>Contract Award - Telfer LP237 Refurbishment and Commissioning</title><link>http://www.gres.com.au/news/article/23042012-120/contract-award-telfer-lp237-refurbishment-and-commissioning.aspx</link><guid>http://www.gres.com.au/news/article/23042012-120/contract-award-telfer-lp237-refurbishment-and-commissioning.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Contract Award - Telfer LP237 Refurbishment and Commissioning" />GR Engineering has been awarded an engineering, procurement and construction (EPC) lump sum contract by Newcrest Mining Limited for the refurbishment and commissioning of the LP237 dump leaching facility at Newcrest&rsquo;s Telfer mine in Western Australia.]]></description><pubDate>Sun, 22 Apr 2012 16:00:00 GMT</pubDate></item><item><title>FY12 Half Yearly Results</title><link>http://www.gres.com.au/news/article/21022012-120/fy12-half-yearly-results.aspx</link><guid>http://www.gres.com.au/news/article/21022012-120/fy12-half-yearly-results.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/FY-Results-Icon-03-100-optimised.jpg" alt="FY12 Half Yearly Results" />FY12 Half Yearly Results]]></description><pubDate>Mon, 20 Feb 2012 16:00:00 GMT</pubDate></item><item><title>Company Update - ASX Release</title><link>http://www.gres.com.au/news/article/07102011-120/company-update-asx-release.aspx</link><guid>http://www.gres.com.au/news/article/07102011-120/company-update-asx-release.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Company Update - ASX Release" />GRES (ASX:GNG) is pleased to provide the following company update:]]></description><pubDate>Thu, 06 Oct 2011 16:00:00 GMT</pubDate></item><item><title>2011 Annual Report</title><link>http://www.gres.com.au/news/article/03102011-122/2011-annual-report.aspx</link><guid>http://www.gres.com.au/news/article/03102011-122/2011-annual-report.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2011_Thumbnail.jpg" alt="2011 Annual Report" /><p>2011 Annual Report</p>
]]></description><pubDate>Sun, 02 Oct 2011 16:00:00 GMT</pubDate></item><item><title>Annual Report - 2011</title><link>http://www.gres.com.au/news/article/06092011-120/annual-report-2011.aspx</link><guid>http://www.gres.com.au/news/article/06092011-120/annual-report-2011.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/Annual_Reports/Annual_Report_2011_Thumbnail.jpg" alt="Annual Report - 2011" />GR Engineering Services Limited 2011 Annual Report]]></description><pubDate>Mon, 05 Sep 2011 16:00:00 GMT</pubDate></item><item><title>Resolute Mining Awards GRES Syama Expansion Project DFS</title><link>http://www.gres.com.au/news/article/15072011-120/resolute-mining-awards-gres-syama-expansion-project-dfs.aspx</link><guid>http://www.gres.com.au/news/article/15072011-120/resolute-mining-awards-gres-syama-expansion-project-dfs.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Resolute Mining Awards GRES Syama Expansion Project DFS" />GRES engaged for Syama expansion study Mali, West Africa.]]></description><pubDate>Thu, 14 Jul 2011 16:00:00 GMT</pubDate></item><item><title>Reed Resources Ltd appoints GRES to the Meekatharra Project BFS team</title><link>http://www.gres.com.au/news/article/22062011-120/reed-resources-ltd-appoints-gres-to-the-meekatharra-project-bfs-team.aspx</link><guid>http://www.gres.com.au/news/article/22062011-120/reed-resources-ltd-appoints-gres-to-the-meekatharra-project-bfs-team.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Reed Resources Ltd appoints GRES to the Meekatharra Project BFS team" />GRES to assist with the Meekatharra gold plant restart]]></description><pubDate>Tue, 21 Jun 2011 16:00:00 GMT</pubDate></item><item><title>PMI Gold Corporation appoints GR Engineering Services to its Obotan Gold Project study team</title><link>http://www.gres.com.au/news/article/20062011-120/pmi-gold-corporation-appoints-gr-engineering-services-to-its-obotan-gold-project-study-team.aspx</link><guid>http://www.gres.com.au/news/article/20062011-120/pmi-gold-corporation-appoints-gr-engineering-services-to-its-obotan-gold-project-study-team.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="PMI Gold Corporation appoints GR Engineering Services to its Obotan Gold Project study team" />GR Engineering awarded Ghana, West Africa gold plant study.]]></description><pubDate>Sun, 19 Jun 2011 16:00:00 GMT</pubDate></item><item><title>King Island Scheelite Limited awards GRES Feasibility Study engineering work</title><link>http://www.gres.com.au/news/article/07062011-120/king-island-scheelite-limited-awards-gres-feasibility-study-engineering-work.aspx</link><guid>http://www.gres.com.au/news/article/07062011-120/king-island-scheelite-limited-awards-gres-feasibility-study-engineering-work.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="King Island Scheelite Limited awards GRES Feasibility Study engineering work" />GRES commences work on the Dolphin Tungsten Project]]></description><pubDate>Mon, 06 Jun 2011 16:00:00 GMT</pubDate></item><item><title>Arbitration Counterclaim by Gold Ridge Mining Ltd</title><link>http://www.gres.com.au/news/article/05062011-120/arbitration-counterclaim-by-gold-ridge-mining-ltd.aspx</link><guid>http://www.gres.com.au/news/article/05062011-120/arbitration-counterclaim-by-gold-ridge-mining-ltd.aspx</guid><description><![CDATA[Arbitration Counterclaim by Gold Ridge Mining Ltd]]></description><pubDate>Sat, 04 Jun 2011 16:00:00 GMT</pubDate></item><item><title>GRES wins contract for TriAusMin Limited's Woodlawn Retreatment Project engineering work</title><link>http://www.gres.com.au/news/article/05052011-120/gres-wins-contract-for-triausmin-limited-s-woodlawn-retreatment-project-engineering-work.aspx</link><guid>http://www.gres.com.au/news/article/05052011-120/gres-wins-contract-for-triausmin-limited-s-woodlawn-retreatment-project-engineering-work.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GRES wins contract for TriAusMin Limited's Woodlawn Retreatment Project engineering work" />GRES commences work on the FEED for Woodlawn]]></description><pubDate>Wed, 04 May 2011 16:00:00 GMT</pubDate></item><item><title>Altona Mining Limited Appoints GRES for the Roseby Copper Project Study, Qld</title><link>http://www.gres.com.au/news/article/07042011-120/altona-mining-limited-appoints-gres-for-the-roseby-copper-project-study-qld.aspx</link><guid>http://www.gres.com.au/news/article/07042011-120/altona-mining-limited-appoints-gres-for-the-roseby-copper-project-study-qld.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Altona Mining Limited Appoints GRES for the Roseby Copper Project Study, Qld" />GRES commences work on the definitive feasibility study]]></description><pubDate>Wed, 06 Apr 2011 16:00:00 GMT</pubDate></item><item><title>Resolute Mining Appoints GRES as Study Manager.</title><link>http://www.gres.com.au/news/article/01032011-120/resolute-mining-appoints-gres-as-study-manager.aspx</link><guid>http://www.gres.com.au/news/article/01032011-120/resolute-mining-appoints-gres-as-study-manager.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Resolute Mining Appoints GRES as Study Manager." />Resolute commence feasibility study for Ravenswood expansion.]]></description><pubDate>Mon, 28 Feb 2011 16:00:00 GMT</pubDate></item><item><title>Richmond Mining awards USA project feasibility study to GRES</title><link>http://www.gres.com.au/news/article/09122010-120/richmond-mining-awards-usa-project-feasibility-study-to-gres.aspx</link><guid>http://www.gres.com.au/news/article/09122010-120/richmond-mining-awards-usa-project-feasibility-study-to-gres.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Richmond Mining awards USA project feasibility study to GRES" />GRES to assist with USA magnetite iron development]]></description><pubDate>Wed, 08 Dec 2010 16:00:00 GMT</pubDate></item><item><title>GR Engineering awarded pre-feasibility study for Argentina gold prospect</title><link>http://www.gres.com.au/news/article/08122010-120/gr-engineering-awarded-pre-feasibility-study-for-argentina-gold-prospect.aspx</link><guid>http://www.gres.com.au/news/article/08122010-120/gr-engineering-awarded-pre-feasibility-study-for-argentina-gold-prospect.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GR Engineering awarded pre-feasibility study for Argentina gold prospect" />Extorre initiates pre-feasibility study for Cerro Moro]]></description><pubDate>Tue, 07 Dec 2010 16:00:00 GMT</pubDate></item><item><title>Woodlark Mining study awarded</title><link>http://www.gres.com.au/news/article/10112010-120/woodlark-mining-study-awarded.aspx</link><guid>http://www.gres.com.au/news/article/10112010-120/woodlark-mining-study-awarded.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Woodlark Mining study awarded" />GRES awarded Papua New Guinea gold plant study]]></description><pubDate>Tue, 09 Nov 2010 16:00:00 GMT</pubDate></item><item><title>Integra announces first gold pour at Randalls</title><link>http://www.gres.com.au/news/article/27092010-120/integra-announces-first-gold-pour-at-randalls.aspx</link><guid>http://www.gres.com.au/news/article/27092010-120/integra-announces-first-gold-pour-at-randalls.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/First-Gold-Pour-Announcement-Icon-2019.jpg" alt="Integra announces first gold pour at Randalls" />Randalls Gold project completed on time and under budget]]></description><pubDate>Sun, 26 Sep 2010 16:00:00 GMT</pubDate></item><item><title>Xstrata awards Cosmos upgrade project</title><link>http://www.gres.com.au/news/article/14092010-120/xstrata-awards-cosmos-upgrade-project.aspx</link><guid>http://www.gres.com.au/news/article/14092010-120/xstrata-awards-cosmos-upgrade-project.aspx</guid><description><![CDATA[Fast track upgrade of nickel concentrator]]></description><pubDate>Mon, 13 Sep 2010 16:00:00 GMT</pubDate></item><item><title>First gold pour at Edna May</title><link>http://www.gres.com.au/news/article/29042010-120/first-gold-pour-at-edna-may.aspx</link><guid>http://www.gres.com.au/news/article/29042010-120/first-gold-pour-at-edna-may.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/First-Gold-Pour-Announcement-Icon-2019.jpg" alt="First gold pour at Edna May" />Edna May project completed on time and under budget]]></description><pubDate>Wed, 28 Apr 2010 16:00:00 GMT</pubDate></item><item><title>GRES awarded Phillips River feasibility study for Tectonic Resources</title><link>http://www.gres.com.au/news/article/22012010-120/gres-awarded-phillips-river-feasibility-study-for-tectonic-resources.aspx</link><guid>http://www.gres.com.au/news/article/22012010-120/gres-awarded-phillips-river-feasibility-study-for-tectonic-resources.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GRES awarded Phillips River feasibility study for Tectonic Resources" />GRES appointed to design the process facility and oversee Phillips River project feasibility study]]></description><pubDate>Thu, 21 Jan 2010 16:00:00 GMT</pubDate></item><item><title>GRES to complete plant design and engineering for the Hemerdon feasibility study</title><link>http://www.gres.com.au/news/article/20012010-120/gres-to-complete-plant-design-and-engineering-for-the-hemerdon-feasibility-study.aspx</link><guid>http://www.gres.com.au/news/article/20012010-120/gres-to-complete-plant-design-and-engineering-for-the-hemerdon-feasibility-study.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="GRES to complete plant design and engineering for the Hemerdon feasibility study" />Wolf Minerals move to advance the feasibility study at the Hemerdon Ball Tungsten and Tin project]]></description><pubDate>Tue, 19 Jan 2010 16:00:00 GMT</pubDate></item><item><title>Edna May project construction update</title><link>http://www.gres.com.au/news/article/12012010-120/edna-may-project-construction-update.aspx</link><guid>http://www.gres.com.au/news/article/12012010-120/edna-may-project-construction-update.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Edna May project construction update" />Edna May project design and construction on schedule and within budget]]></description><pubDate>Mon, 11 Jan 2010 16:00:00 GMT</pubDate></item><item><title>Randalls project approved for development</title><link>http://www.gres.com.au/news/article/30122009-120/randalls-project-approved-for-development.aspx</link><guid>http://www.gres.com.au/news/article/30122009-120/randalls-project-approved-for-development.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Randalls project approved for development" />GRES awarded contract for 1.2 Mtpa gold plant]]></description><pubDate>Tue, 29 Dec 2009 16:00:00 GMT</pubDate></item><item><title>YTC Resources award Hera DFS to GRES</title><link>http://www.gres.com.au/news/article/20112009-120/ytc-resources-award-hera-dfs-to-gres.aspx</link><guid>http://www.gres.com.au/news/article/20112009-120/ytc-resources-award-hera-dfs-to-gres.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="YTC Resources award Hera DFS to GRES" />GRES appointed as study manager for Hera definitive feasibility study]]></description><pubDate>Thu, 19 Nov 2009 16:00:00 GMT</pubDate></item><item><title>Higginsville paste plant commences operations</title><link>http://www.gres.com.au/news/article/06102009-148/higginsville-paste-plant-commences-operations.aspx</link><guid>http://www.gres.com.au/news/article/06102009-148/higginsville-paste-plant-commences-operations.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Higginsville paste plant commences operations" />The Higginsville paste plant completed on schedule and under budget]]></description><pubDate>Mon, 05 Oct 2009 16:00:00 GMT</pubDate></item><item><title>GR Engineering to complete Cosmic Boy upgrade</title><link>http://www.gres.com.au/news/article/12082009-120/gr-engineering-to-complete-cosmic-boy-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/12082009-120/gr-engineering-to-complete-cosmic-boy-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="GR Engineering to complete Cosmic Boy upgrade" />Western Areas announces award of the upgrade of the Cosmic Boy nickel concentrator to GRES.]]></description><pubDate>Tue, 11 Aug 2009 16:00:00 GMT</pubDate></item><item><title>Award of Simberi upgrade study</title><link>http://www.gres.com.au/news/article/15062009-120/award-of-simberi-upgrade-study.aspx</link><guid>http://www.gres.com.au/news/article/15062009-120/award-of-simberi-upgrade-study.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Award of Simberi upgrade study" />Allied Gold Limited award study to upgrade the Simberi gold plant to three million tonnes per year]]></description><pubDate>Sun, 14 Jun 2009 16:00:00 GMT</pubDate></item><item><title>Edna May project awarded to GRES </title><link>http://www.gres.com.au/news/article/26052009-120/edna-may-project-awarded-to-gres.aspx</link><guid>http://www.gres.com.au/news/article/26052009-120/edna-may-project-awarded-to-gres.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Edna May project awarded to GRES " />GR Engineering Services have received a &quot;Letter of Conditional Award&quot; from Catalpa Resources Limited enabling GRES to commence project works for the Edna May Operations.]]></description><pubDate>Mon, 25 May 2009 16:00:00 GMT</pubDate></item><item><title>GRES achieves 12 months injury free</title><link>http://www.gres.com.au/news/article/15052009-120/gres-achieves-12-months-injury-free.aspx</link><guid>http://www.gres.com.au/news/article/15052009-120/gres-achieves-12-months-injury-free.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Safety-Announcement-Icon-2019.jpg" alt="GRES achieves 12 months injury free" />12 month rolling &#39;lost time injury frequency rate&#39; drops to zero]]></description><pubDate>Thu, 14 May 2009 16:00:00 GMT</pubDate></item><item><title>Western Areas Cosmic Boy Project achieves practical completion on schedule</title><link>http://www.gres.com.au/news/article/08042009-120/western-areas-cosmic-boy-project-achieves-practical-completion-on-schedule.aspx</link><guid>http://www.gres.com.au/news/article/08042009-120/western-areas-cosmic-boy-project-achieves-practical-completion-on-schedule.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Western Areas Cosmic Boy Project achieves practical completion on schedule" />This represents an outstanding effort by the GRES project team]]></description><pubDate>Tue, 07 Apr 2009 16:00:00 GMT</pubDate></item><item><title>Catalpa Resources Limited announces Letter of Intent for Edna May Gold Project</title><link>http://www.gres.com.au/news/article/11032009-120/catalpa-resources-limited-announces-letter-of-intent-for-edna-may-gold-project.aspx</link><guid>http://www.gres.com.au/news/article/11032009-120/catalpa-resources-limited-announces-letter-of-intent-for-edna-may-gold-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Update-Icon-2019.jpg" alt="Catalpa Resources Limited announces Letter of Intent for Edna May Gold Project" />GR Engineering Services provided with Letter of Intent to enter into a supply agreement to refurbish and construct the Big Bell processing facility on site at its Edna May Gold Project near Westonia in Western Australia.]]></description><pubDate>Tue, 10 Mar 2009 16:00:00 GMT</pubDate></item><item><title>Commissioning starts at Cosmic Boy</title><link>http://www.gres.com.au/news/article/22012009-120/commissioning-starts-at-cosmic-boy.aspx</link><guid>http://www.gres.com.au/news/article/22012009-120/commissioning-starts-at-cosmic-boy.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Commissioning starts at Cosmic Boy" />Commissioning of the concentrator commenced in December 2008 with the energisation of equipment in the crushing area. By the end of January 2009 wet commissioning will be completed in all areas of the plant.]]></description><pubDate>Wed, 21 Jan 2009 16:00:00 GMT</pubDate></item><item><title>Progress continues of the Forrestania Cosmic Boy Nickel Concentrator</title><link>http://www.gres.com.au/news/article/15102008-120/progress-continues-of-the-forrestania-cosmic-boy-nickel-concentrator.aspx</link><guid>http://www.gres.com.au/news/article/15102008-120/progress-continues-of-the-forrestania-cosmic-boy-nickel-concentrator.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Progress continues of the Forrestania Cosmic Boy Nickel Concentrator" />Design and construction has passed the halfway mark and recently the 40 plate filter press was shipped from Japan representing a procurement milestone for the project.]]></description><pubDate>Tue, 14 Oct 2008 16:00:00 GMT</pubDate></item><item><title>Sinclair Project achieves practical completion</title><link>http://www.gres.com.au/news/article/08102008-120/sinclair-project-achieves-practical-completion.aspx</link><guid>http://www.gres.com.au/news/article/08102008-120/sinclair-project-achieves-practical-completion.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Sinclair Project achieves practical completion" />GR Engineering Services is pleased to announce that the Sinclair Nickel Project achieved practical completion on 8 October 2008.]]></description><pubDate>Tue, 07 Oct 2008 16:00:00 GMT</pubDate></item><item><title>Universal Resources announces upgrade to Roseby Copper Project</title><link>http://www.gres.com.au/news/article/03092008-120/universal-resources-announces-upgrade-to-roseby-copper-project.aspx</link><guid>http://www.gres.com.au/news/article/03092008-120/universal-resources-announces-upgrade-to-roseby-copper-project.aspx</guid><description><![CDATA[Universal Resources today announced an upgrade to the Roseby Project economics following review of the project by GR Engineering Services.]]></description><pubDate>Tue, 02 Sep 2008 16:00:00 GMT</pubDate></item><item><title>Commissioning starts at Sinclair Nickel Project</title><link>http://www.gres.com.au/news/article/18082008-120/commissioning-starts-at-sinclair-nickel-project.aspx</link><guid>http://www.gres.com.au/news/article/18082008-120/commissioning-starts-at-sinclair-nickel-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Commissioning starts at Sinclair Nickel Project" />The Sinclair Nickel project continued to maintain scheduled progress with the commencement of commissioning on 18 August 2008.]]></description><pubDate>Sun, 17 Aug 2008 16:00:00 GMT</pubDate></item><item><title>GR Engineering Services appointed as prime contractor to construct the Roseby Copper Project process plant and infrastructure</title><link>http://www.gres.com.au/news/article/28072008-120/gr-engineering-services-appointed-as-prime-contractor-to-construct-the-roseby-copper-project-process-plant-and-infrastructure.aspx</link><guid>http://www.gres.com.au/news/article/28072008-120/gr-engineering-services-appointed-as-prime-contractor-to-construct-the-roseby-copper-project-process-plant-and-infrastructure.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GR Engineering Services appointed as prime contractor to construct the Roseby Copper Project process plant and infrastructure" />Universal Resources Limited and GR Engineering Services have signed a Conditional Letter of Intent and are proceeding to negotiate a formal EPC contract to execute the design and construction works.]]></description><pubDate>Sun, 27 Jul 2008 16:00:00 GMT</pubDate></item><item><title>Practical completion achieved at Higginsville Treatment Plant</title><link>http://www.gres.com.au/news/article/25062008-120/practical-completion-achieved-at-higginsville-treatment-plant.aspx</link><guid>http://www.gres.com.au/news/article/25062008-120/practical-completion-achieved-at-higginsville-treatment-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Practical completion achieved at Higginsville Treatment Plant" />With practical completion achieved on schedule and within budget, the Higginsville design and construction project has been successfully completed with first ore going through the mill on 16 June 2008.]]></description><pubDate>Tue, 24 Jun 2008 16:00:00 GMT</pubDate></item><item><title>Dismantling and removal of New Celebration gold processing plant completed ahead of schedule</title><link>http://www.gres.com.au/news/article/02062008-120/dismantling-and-removal-of-new-celebration-gold-processing-plant-completed-ahead-of-schedule.aspx</link><guid>http://www.gres.com.au/news/article/02062008-120/dismantling-and-removal-of-new-celebration-gold-processing-plant-completed-ahead-of-schedule.aspx</guid><description><![CDATA[GR Engineering Services was contracted by Integra Mining Limited to dismantle and remove the gold processing plant from the New Celebration site, with works completed one month ahead of the practical completion date of 30 June 2008.]]></description><pubDate>Sun, 01 Jun 2008 16:00:00 GMT</pubDate></item><item><title>Higginsville Treatment Plant nears practical completion</title><link>http://www.gres.com.au/news/article/26052008-120/higginsville-treatment-plant-nears-practical-completion.aspx</link><guid>http://www.gres.com.au/news/article/26052008-120/higginsville-treatment-plant-nears-practical-completion.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Higginsville Treatment Plant nears practical completion" />The Higginsville Treatment Plant commenced dry commissioning of the process facilities during the month of May, reaching this milestone maintains the focus of completing the facilities on schedule for handover to Avoca.]]></description><pubDate>Sun, 25 May 2008 16:00:00 GMT</pubDate></item><item><title>Sinclair Nickel Project reaches significant milestone</title><link>http://www.gres.com.au/news/article/15052008-120/sinclair-nickel-project-reaches-significant-milestone.aspx</link><guid>http://www.gres.com.au/news/article/15052008-120/sinclair-nickel-project-reaches-significant-milestone.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Sinclair Nickel Project reaches significant milestone" />The Sinclair Nickel project achieved a significant milestone on Wednesday 14th May with the transport to site and placement of the project&#39;s two fully refurbished grinding mills.]]></description><pubDate>Wed, 14 May 2008 16:00:00 GMT</pubDate></item><item><title>Western Areas NL award design and construction contract</title><link>http://www.gres.com.au/news/article/02052008-120/western-areas-nl-award-design-and-construction-contract.aspx</link><guid>http://www.gres.com.au/news/article/02052008-120/western-areas-nl-award-design-and-construction-contract.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Western Areas NL award design and construction contract" />GR Engineering Services (GRES) appointed by Western Areas NL to undertake the engineering, design, procurement, construction and commissioning of the Forrestania Nickel Cosmic Boy Concentrator Project.]]></description><pubDate>Thu, 01 May 2008 16:00:00 GMT</pubDate></item><item><title>Higginsville Treatment Plant on target for commissioning</title><link>http://www.gres.com.au/news/article/30042008-120/higginsville-treatment-plant-on-target-for-commissioning.aspx</link><guid>http://www.gres.com.au/news/article/30042008-120/higginsville-treatment-plant-on-target-for-commissioning.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Higginsville Treatment Plant on target for commissioning" />The final shipment for the Higginsville ball mill was delivered in April, completing the critical equipment deliveries and setting the site works up for on-schedule commissioning in June 2008.]]></description><pubDate>Tue, 29 Apr 2008 16:00:00 GMT</pubDate></item><item><title>GR Engineering Services to update feasibility study on the Panton Project</title><link>http://www.gres.com.au/news/article/05032008-120/gr-engineering-services-to-update-feasibility-study-on-the-panton-project.aspx</link><guid>http://www.gres.com.au/news/article/05032008-120/gr-engineering-services-to-update-feasibility-study-on-the-panton-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="GR Engineering Services to update feasibility study on the Panton Project" />Platinum Australia Limited have appointed GRES as Lead Engineer to update the Panton PGM (&quot;Platinum Group Metal&quot;) Project Bankable Feasibility Study]]></description><pubDate>Tue, 04 Mar 2008 16:00:00 GMT</pubDate></item><item><title>Ball mill fabrication nears completion in China</title><link>http://www.gres.com.au/news/article/04022008-120/ball-mill-fabrication-nears-completion-in-china.aspx</link><guid>http://www.gres.com.au/news/article/04022008-120/ball-mill-fabrication-nears-completion-in-china.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Ball mill fabrication nears completion in China" />Project management representatives visited Citic Heavy Machinery Company Ltd in China in January to view the fabrication progress of the ball mill, scheduled to leave China in February with the first shipment planned to arrive at Higginsville Treatment Plant in early March]]></description><pubDate>Sun, 03 Feb 2008 16:00:00 GMT</pubDate></item><item><title>GRES awarded Bonnie Creek scoping study for the 3 Mtpa Nullagine Iron Ore project</title><link>http://www.gres.com.au/news/article/17012008-120/gres-awarded-bonnie-creek-scoping-study-for-the-3-mtpa-nullagine-iron-ore-project.aspx</link><guid>http://www.gres.com.au/news/article/17012008-120/gres-awarded-bonnie-creek-scoping-study-for-the-3-mtpa-nullagine-iron-ore-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="GRES awarded Bonnie Creek scoping study for the 3 Mtpa Nullagine Iron Ore project" />BC Iron Limited has appointed GR Engineering Services to manage the Bonnie Creek scoping study for their proposed new Nullagine direct shipping ore (DSO) iron ore project. GRES will complete civil, mine and plant preliminary designs.]]></description><pubDate>Wed, 16 Jan 2008 16:00:00 GMT</pubDate></item><item><title>Progress continues on Higginsville Treatment Plant</title><link>http://www.gres.com.au/news/article/14122007-120/progress-continues-on-higginsville-treatment-plant.aspx</link><guid>http://www.gres.com.au/news/article/14122007-120/progress-continues-on-higginsville-treatment-plant.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Progress continues on Higginsville Treatment Plant" />Design and construction of the Higginsville Treatment Plant, located approximately 50 km north of Norseman in the Eastern Goldfields region of Western Australia, has reached the half way mark]]></description><pubDate>Thu, 13 Dec 2007 16:00:00 GMT</pubDate></item><item><title>Site works commence at Sinclair Nickel Project</title><link>http://www.gres.com.au/news/article/25112007-120/site-works-commence-at-sinclair-nickel-project.aspx</link><guid>http://www.gres.com.au/news/article/25112007-120/site-works-commence-at-sinclair-nickel-project.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Site works commence at Sinclair Nickel Project" />Site works have commenced on schedule at the Sinclair Nickel Project with the earthworks contractor mobilising to site in late November]]></description><pubDate>Sat, 24 Nov 2007 16:00:00 GMT</pubDate></item><item><title>Nickel Concentrator Plant prefeasibility study successfully completed</title><link>http://www.gres.com.au/news/article/20112007-120/nickel-concentrator-plant-prefeasibility-study-successfully-completed.aspx</link><guid>http://www.gres.com.au/news/article/20112007-120/nickel-concentrator-plant-prefeasibility-study-successfully-completed.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="Nickel Concentrator Plant prefeasibility study successfully completed" />Poseidon Nickel announced that the prefeasibility study has been successfully completed by GR Engineering Services into the nickel concentrator plant for their Mt Windarra mine]]></description><pubDate>Mon, 19 Nov 2007 16:00:00 GMT</pubDate></item><item><title>Sally Malay Project completed</title><link>http://www.gres.com.au/news/article/22102007-120/sally-malay-project-completed.aspx</link><guid>http://www.gres.com.au/news/article/22102007-120/sally-malay-project-completed.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Completion-Icon-Optimitsed.jpg" alt="Sally Malay Project completed" />Works on the Sally Malay Paste Backfill Project for Kimberley Nickel Mines reaches Practical Completion]]></description><pubDate>Sun, 21 Oct 2007 16:00:00 GMT</pubDate></item><item><title>Kalgoorlie office operational</title><link>http://www.gres.com.au/news/article/18102007-120/kalgoorlie-office-operational.aspx</link><guid>http://www.gres.com.au/news/article/18102007-120/kalgoorlie-office-operational.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Project-Commissioning---Commencement-Icon-2019.jpg" alt="Kalgoorlie office operational" />Less than one year after commencing operations in Perth, GR Engineering Services have expanded and opened an office in Kalgoorlie]]></description><pubDate>Wed, 17 Oct 2007 16:00:00 GMT</pubDate></item></channel></rss>