﻿<?xml version="1.0" encoding="utf-8"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><atom:link href="https://www.gres.com.au/rss/default.aspx?cid=179" rel="self" type="application/rss+xml" /><link>http://www.gres.com.au:8081/rss/default.aspx?cid=179</link><title>Mintox RSS Feed</title><description>News Feed</description><pubDate>Sun, 19 Apr 2026 08:58:33 GMT</pubDate><lastBuildDate>Sun, 19 Apr 2026 08:58:33 GMT</lastBuildDate><generator>Mintox</generator><item><title>King of the Hills Operations Stage 2 Upgrade </title><link>http://www.gres.com.au/news/article/05062025-179/king-of-the-hills-operations-stage-2-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/05062025-179/king-of-the-hills-operations-stage-2-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="King of the Hills Operations Stage 2 Upgrade " />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded a variation to its existing engineering, procurement and construction (EPC) contract with Greenstone Resources (WA) Pty Ltd, a wholly owned subsidiary of Vault Minerals Limited (ASX:VAU) (Vault), for the Stage 2 Upgrade for the King of the Hills Operations (Stage 2 Upgrade).&nbsp;]]></description><pubDate>Wed, 04 Jun 2025 16:00:00 GMT</pubDate></item><item><title>EPC Contract – King of the Hills Operations Stage 1 Upgrade</title><link>http://www.gres.com.au/news/article/28012025-179/epc-contract-king-of-the-hills-operations-stage-1-upgrade.aspx</link><guid>http://www.gres.com.au/news/article/28012025-179/epc-contract-king-of-the-hills-operations-stage-1-upgrade.aspx</guid><description><![CDATA[<img src="http://www.gres.com.au/theme/grescomau/assets/public/Image/News/thumbs/Contract-Award-Icon-Optimised.jpg" alt="EPC Contract – King of the Hills Operations Stage 1 Upgrade" />GR Engineering Services Limited (ASX:GNG) (GR Engineering) is pleased to announce that it has been awarded an engineering, procurement and construction (EPC) contract with Greenstone Resources (WA) Pty Ltd, a wholly owned subsidiary of Vault Minerals Limited (ASX:VAU) (Vault), for the Stage 1 Upgrade for the King of the Hill Operations (the Project).&nbsp;]]></description><pubDate>Mon, 27 Jan 2025 16:00:00 GMT</pubDate></item></channel></rss>