Nova Nickel Project
 

Client
 

Sirius Resources NL [a wholly owned subsidiary of Independence Group Limited (ASX:IGO)]

Award Date
 

June 2015 (preferred contractor status March 2015)

Completion Date
 

December 2016

Location
 

Fraser Range region of Western Australia

Project Manager
 

Geoff Tanner

Scope of Work
 

GR Engineering was engaged by Sirius (now IGO) to undertake the engineering, procurement and construction (EPC) of the Nova Nickel Project concentrator plant, underground paste backfill plant and non-process infrastructure. The 1.8 million tonne per annum concentrator was constructed to treat underground ore mined from the Nova-Bollinger Mine located 120 km east of Norseman, WA.  The concentrator was designed to produce 331,000 tonnes of nickel and 83,000 tonnes of copper concentrate each year.

The plant included single stage crushing, with conveyors that deliver the ore to a coarse ore bin.  Coarse ore is ground in a two stage grinding circuit that comprises a SAG and ball mill.   The ore/slurry from the grinding circuit is classified via the mill cyclones and the cyclone overflow undergoes differential flotation. The nickel and copper flotation circuits have dedicated regrind, cleaning and re-cleaning processes to optimise metal recovery in each circuit.

Plant tailings are pumped to a cemented paste back-fill plant with the paste product delivered underground via a borehole and underground distribution system, or plant tailings can be pumped to a tailing storage facility when paste fill is not required in the mine.